Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Bear River City zoning code

8D.1.4 Monuments (Survey Markers)

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Bear River City code is at https://www.bearrivercityutah.gov/city-ordinances/. Text pulled 2026-10-19 from this source. Partial copy: chapters 1, 2, 3, 7 (the zone districts) and 10 are scanned images on the city's site and are not included. Use the official code for those. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Bear River City planning before you rely on it.
The applicant shall place permanent reference monuments in the subdivision as required herein or as otherwise required by the City Engineer and appropriate City Official. (a) Monuments shall be constructed in accordance with the Bear River City Public Works Construction Standards and located on street right-of-way lines, at street intersections, angle points of curve and block corners. They shall be spaced so as to be within sight of each other, the sight lines being contained wholly within the street limits. (b) Permanent reference monuments are required in each of the four corners of each building lot in the subdivision. During construction temporary markers may be placed in the front corners with permanent monuments required in the back corners. All permanent monuments in the front corners are required before any building permits are issued. If a building lot contains more than four (4) corners, only four (4) monuments are required. If a building lot contains less than four (4) corners at least three (3) monuments are required. If permanent reference monuments are already in place additional monuments are not required. (c) All monuments shall be properly set in the ground and approved by a Registered Land Surveyor, licensed in the state of Utah, prior to the final plat approval unless a performance guarantee is established in accordance with the provisions of this ordinance.

8D.1.3 Plats Straddling Municipal Boundaries, Annexations · 8D.1.5 Character of the Land and Unsuitability

Ask a broker about Bear River City zoning, free

CallTextFree summary