- Zone (zoning district)
- The category a property is placed in on the zoning map, like C-2 or R-1-8. Each zone has its own list of uses and standards. Every city names its zones its own way.
- Zoning map
- The city or county's official map showing which zone each property is in.
- Zoning code (land use ordinance)
- The city's written rules for each zone: what uses are allowed and how buildings must be placed and sized.
- Permitted use
- A use the zone allows as long as the project meets the zone's standards.
- Conditional use
- A use the zone allows after a review. The city can attach conditions, like hours, screening or traffic changes, to deal with its likely impacts.
- Setback
- The minimum distance a building must sit from a property line or street.
- Lot coverage
- How much of a lot buildings may cover, usually as a percentage.
- Floor area ratio (FAR)
- Total building floor area divided by lot area. A 1.0 FAR on a 20,000 sq ft lot allows about 20,000 sq ft of floor space, spread over however many floors the height limit allows.
- Density
- How many homes are allowed per acre. It often decides how many apartments or townhomes fit.
- Parking ratio
- How many parking spaces a use must provide, often per 1,000 sq ft of building or per unit.
- Overlay zone
- A layer of extra rules on top of the base zone, for example near an airport, a highway corridor or a downtown.
- General plan
- The city's long-range vision for land use. It is not zoning, but cities lean on it when they decide a rezone.
- Rezone
- A request to move a property into a different zone. The planning commission usually makes a recommendation after a public hearing, and the city council decides.
- Variance
- A narrow exception to a standard, like a setback, when a property has unusual circumstances. Variances generally can't allow a use the zone doesn't allow.
- Nonconforming use ("grandfathered")
- A use or building that was legal before the rules changed. It may keep going, usually with limits on expanding or rebuilding.
- Planned unit development (PUD)
- A custom set of rules approved for one project, often with a site plan or development agreement that decides what is allowed.
- Development agreement
- A contract between a developer and the city setting out what will be built and what each side will do.
- Site plan review
- The city's check that a specific project's layout meets the code before permits are issued.
- Subdivision (plat)
- Dividing land into lots. It needs city or county approval and a recorded plat map.
- Impact fee
- A one-time fee a new project pays toward roads, water, sewer, parks or public safety it adds demand for.
- Entitlements
- The approvals a project needs before building: zoning, site plan, subdivision and the like.
- Zoning verification letter
- A letter from the city stating a property's zone and, often, whether its current use conforms. Lenders often ask for one.
- Accessory dwelling unit (ADU)
- A second, smaller home on the same lot as a house, inside it or separate. Utah law requires most cities to allow the kind inside a house.
- Mixed use
- Shops, offices and homes in the same building or on the same block.
Want to see them in action? Try the Zone Decoder or read how Utah zoning works.