8D.4.1 General Requirements
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Bear River City code is at https://www.bearrivercityutah.gov/city-ordinances/.
Text pulled 2026-10-19 from this source.
Partial copy: chapters 1, 2, 3, 7 (the zone districts) and 10 are scanned images on the city's site and are not included. Use the official code for those.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Bear River City planning before you rely on it.
The Planning Commission shall not recommend for approval any subdivision plat which does not make adequate provision for storm or flood water runoff channels or catch basins in their opinion. Plans shall be reviewed for compliance with the Bear River City Design Standards, Construction Specifications, and Standard Drawings or other standards as may be adopted. The storm water drainage system shall be separate and independent of the sanitary sewer system. Storm sewers, where required, shall be designed by the Rational Method, or other methods as approved by the City Engineer and Appropriate City Official, and a copy of design computations shall be submitted along with plans. Inlets shall be provided so that surface water is not carried across or around any intersection, nor for a distance of more than six hundred (600) feet in the gutter. When calculations indicate that curb capacities are exceeded at a point, catch basins shall be used to intercept flow at that point. Surface water drainage patterns shall be shown for each and every lot and block.