Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Bear River City zoning code

8D.6.3 Future Sewer Accessibility Requirements

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Bear River City code is at https://www.bearrivercityutah.gov/city-ordinances/. Text pulled 2026-10-19 from this source. Partial copy: chapters 1, 2, 3, 7 (the zone districts) and 10 are scanned images on the city's site and are not included. Use the official code for those. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Bear River City planning before you rely on it.
If a subdivision has more than three (3) developable lots, including any future phases and in the City’s opinion, the project is in an area that may be serviced with a sewer system in the next 10 years, the City Council or Planning Commission may require sewer improvements to be installed in the subdivision. These improvements must be constructed to current City standards, properly capped, marked as to their termination in the lots (with acceptable “as-built” drawings provided to the City) and be made separate from the septic system in place or proposed. This system would make it more feasible and less costly and troublesome on the residents of the subdivision in the future when the service would be available and/or the connection would become mandatory. Sidewalks, Curbs, Hiking Trails, Bike Paths, Horse Trails

8D.6.2 Residential and Non-residential Subdivisions Sanitary · 8D.7.1 Location Sidewalks

Ask a broker about Bear River City zoning, free

CallTextFree summary