4-8-050 Inspections
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Box Elder County code is at https://www.boxeldercountyut.gov/241/Land-Use-Management-Development-Code.
Text pulled 2026-10-19 from this source.
Chapter 5-4 (Flood Damage Prevention) is a scanned image on the county's site and is not included.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Box Elder County planning before you rely on it.
A. The Zoning Administrator and Building Official, with assistance from the County Engineer, shall make the inspections hereinafter required and shall either approve that portion of the work completed or shall notify the permittee wherein the same fails to comply with this section. Where it is found by inspection that conditions are not substantially as stated or shown in the conditional use permit application, the inspector may stop further work until and unless approval is obtained for a revised grading plan conforming to the existing conditions.
B. Plans for grading work, bearing the stamp of approval of the Planning Commission, shall be maintained at the site during the progress of the grading. Until the final inspection is made, a card issued by the County indicating
permission to grade has been granted shall be prominently displayed near the front property line of the property involved so as to be visible from the street on which the property fronts.
C. In order to obtain inspections, the permittee shall notify the County at least twenty-four (24) hours before said inspection is to be made.
D. Inspections shall be made:
1. Before commencement of grading operations and after required construction stakes have been set; and
2. When all rough grading has been completed; and
3. When all work, including installation of all drainage and other structures and required planting has been completed.
4-8-040 Retention of Plans · 4-8-060 Standards and Specific Requirements