9-6 Final Plat
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Bryce Canyon City code is at https://brycecanyoncityut.gov/community-plan/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Bryce Canyon City planning before you rely on it.
The subdivider shall prepare and submit a final plat, together with a completed application, the required fees and either a policy of title insurance or a preliminary title report showing proof of ownership or right to title, and to allow effective dedication of streets and easements within the subdivision without boundary exceptions. Fees shall be paid to Bryce Canyon City Clerk. Subdivision plats shall be filed with the Garfield County Recorder’s Office in accordance with applicable Garfield County ordinances and standards.
1. Preparation of Plat: A final plat shall be prepared for all subdivisions. Said plat shall be drawn on a sheet of vellum or mylar having outside or trim line dimensions of twentyfour inches by thirty-six inches. The border line of the plat shall be drawn in heavy lines, leaving a margin of at least one and one-half inches on the left-hand side of the sheet for binding, and at least one-half inch on the other three sides of the sheet. The plat shall be so drawn that the top of the sheet faces either north or east, whichever accommodates the drawing better. All lines, dimensions and markings shall be made on the tracing linen with waterproof black ink. The actual map shall be made with a minimum scale of oneinch equals fifty feet. Details and the workmanship on finished drawings shall be clear and readable. A poorly drawn, incomplete or illegible plat is sufficient cause for rejection.
2. Final Plat Application: A final plat shall be furnished for all proposed land divisions and shall meet the requirements of the County Surveyor, County Recorder and Bryce Canyon City.
3. Final Decision; Signatures Required: The chairman of the Planning Commission and the Mayor shall both sign the final plat, noting the final decision of Bryce Canyon City Council.
4. Filing and Recording: After the map or plat has been duly certified and approved by Bryce Canyon City Council, the developer shall file and record the approved final plat in the Office of the County Recorder. Such recording shall be completed within 30 days from the date of the final approval.
5. Phasing of Plats: The final platting of subdivisions may be done in phases. Each phase shall consist of the number of lots which can be completely developed with off-site improvements within period approved by the Planning Commission and City Council. If the roads and utilities are not established within the approved time period, the plat shall be considered null and void and subject to reapplication by the subdivider unless an extension has been approved by the Planning Commission and City Council.