Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Cache County zoning code

17.13.060 MINERAL EXTRACTION AND EXCAVATION MASTER PLAN

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Cache County code is at https://www.cachecounty.gov/assets/department/clerk/cachecountyut-ut-2.pdf. Text pulled 2026-10-19 from this source. Titles 16 and 17 only, from the PDF on the county's own website (prepared by its code publisher; publisher notes removed). Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Cache County planning before you rely on it.
All applications for a mineral extraction and excavation Master Plan shall be accompanied by the following materials: A. A completed application form for a conditional use permit; B. Evidence of ownership or control over the land and a legal description of the property where the extraction operation will be located; C. A site plan showing the following: 1. Dimensions of the excavation site and of the parcel; 2. Locations of clearances, rights of way, easements, utility lines, existing watercourses and drainage; 3. Property lines with names and parcel tax identification numbers of adjoining property owners; 4. Proposed ingress and egress; 5. A contour map based on the USGS 7.5 minute quadrangle and estimate of materials to be removed; and 6. The location of the sand and gravel overlay area on the site. D. Excavation operations plan that outlines the following: 1. Traffic arrangements proposed on existing roads and streets adjoining the site; 2. The location, arrangement and dimensions of loading and processing facilities; and 3. On site control of surface and storm water drainage. E. A reclamation plan addressing the following: 1. Closure of the extraction operation stating the phasing, acreage and duration of the operation; and 2. Financial guarantee for the rehabilitation and reclamation extraction operation.

17.13.050 OPERATION CATEGORIES · 17.13.070 MINIMUM REQUIREMENTS

Ask a broker about Cache County zoning, free

CallTextFree summary