17.20.040 APPLICATION AND REVIEW PROCEDURE
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Cache County code is at https://www.cachecounty.gov/assets/department/clerk/cachecountyut-ut-2.pdf.
Text pulled 2026-10-19 from this source.
Titles 16 and 17 only, from the PDF on the county's own website (prepared by its code publisher; publisher notes removed).
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Cache County planning before you rely on it.
A. Conditional Use Permit:
1. All requests shall be reviewed and considered consistent with the procedures for the review of a conditional use as provided in section 17.06.050 of this title, the standards of this chapter, and must include the following:
a. A completed application signed by the applicant.
b. A copy of the lease or a letter of authorization from property owner evidencing the applicant's authority to pursue a conditional use permit.
c. As defined by the FCC under FCC report and order FCC 14-153, identify if the proposal qualifies as a substantial change.
d. A development plan prepared and certified by an appropriate professional that consists of:
(1) Property boundaries, setbacks, topography, elevation views, and dimensions of improvements drawn to scale.
(2) A written description and scaled drawings of the proposed support structure, including structure height, ground and structure design, and proposed materials.
(3) The number and type of proposed antennas and their height above ground level, including the proposed placement of antennas on the support structure.
(4) A line of sight diagram or photo simulation, showing the proposed support structure set against the skyline and viewed from at least three (3) directions within the surrounding areas.
e. A copy of the supporting federal certifications as follows:
(1) Federal communications commission (FCC) license for the facility, or a signed, notarized statement from the owner and/or operator of the facility attesting that the facility complies with all current FCC regulations.
(2) Certification by an appropriate professional that the proposed facility will comply with all of the applicable standards of the American National Standards Institute (ANSI), the Electronics Industries Association standard for antenna towers and antenna support structures, and any other applicable technical and structural codes.
f. A written description of how the proposed facility fits into the applicant's telecommunication network. As part of this description, the applicant shall describe anticipated maintenance needs, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance. In all cases, the equipment at a telecommunication facility shall be automated to the greatest extent possible to reduce traffic, congestion, and noise associated with maintenance and upkeep of the facility.
g. Application fee.
B. Administrative Zoning Clearance:
1. All requests must include the following:
a. A completed zoning clearance application signed by the applicant.
b. A copy of the lease or a letter of authorization from property owner evidencing the applicant's authority to pursue a zoning clearance.
c. As defined by the FCC under FCC report and order FCC 14-153, provide supporting documentation that identifies if the proposal qualifies as a substantial change.
d. A development plan prepared and certified by an appropriate professional that consists of:
(1) Graphic and written descriptions of proposed improvements related to the requirements listed in this chapter and including property boundaries, setbacks, topography, elevation views, dimensions of improvements, the number and type of proposed antennas and their height above ground level, including the proposed placement of antennas on the support structure.
e. Application fee. See Consolidated Fee Schedule for amount of fee.
C. Exempt: No application or review required.
17.20.030 APPROVAL AUTHORITY · 17.20.050 GENERAL STANDARDS AND DESIGN REQUIREMENTS