5-4 Site Plan and Building Permit Required

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Cannonville code is at https://cannonville.gov/document-library/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Cannonville planning before you rely on it.
A detailed site plan, drawn to scale to be determined by the Building Official shall be filed as part of any application, prior to consideration for any building permit. The construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal and demolition of structures, or any part thereof, as provided or as restricted in this Ordinance, shall not be commenced, or proceeded with except after the issuance of a written permit for the same by the Building Official. If work is not started on a structure or building within 180 days from issuance of a permit and new permit will be required. Pursuant to the issuance of a building permit in Cannonville Town, the applicant shall submit evidence of having an approved potable water supply and an approved method of waste disposal. Both the water supply and the method of waste disposal shall be approved in writing by the applicable health department prior to the issuance of a building permit.

5-3 Inspection · 5-5 Certificate of Occupancy Required

Ask a broker about Cannonville zoning, free

CallTextFree summary