Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Castle Valley zoning code

4.13 TEMPORARY DWELLING DECOMMISSIONING

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Castle Valley code is at https://castlevalleyutah.gov/documents/ordinances.php. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Castle Valley planning before you rely on it.
One Temporary Dwelling may be located on a legally platted lot with a new Dwelling under construction, along with a Decommissioning Contract. A Temporary Dwelling must be decommissioned no later than thirty (30) days after the occupancy of a new permanent Dwelling on a legally platted lot. Decommissioning may include removal of the Temporary Dwelling RV, or change of use to a stored RV, including disconnecting from a septic system. A site inspection by a Town official will be held to verify the decommissioning of the Temporary Dwelling.

4.12 TEMPORARY DWELLING PERMIT RENEWAL · 4.14 SOLAR ENERGY SYSTEMS

Ask a broker about Castle Valley zoning, free

CallTextFree summary