2-8.5 PERMITS
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Cleveland code is at http://www.clevelandtown.org/planning--zoning.htm.
Text pulled 2026-10-19 from this source.
Zoning ordinance only; the subdivision ordinance is a scanned image on the town's site and is not included.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Cleveland planning before you rely on it.
A. Permits Required. Unless specifically exempted, a permit must be obtained from the land use authority for the erection and maintenance of all signs erected or maintained within this jurisdiction and in accordance with other ordinances of this jurisdiction. Exemptions from the necessity of securing a permit, however, shall not be construed to relieve the owner of the sign involved from responsibility for its erection and maintenance in a safe manner and in a manner in accordance with all the other provisions of this ordinance.
B. Construction Documents. Before any permit is granted for the erection of a sign or sign structure requiring such permit, construction documents shall be filed with the land use authority showing the dimensions, materials and required details of construction, including loads, stresses, anchorage and any other pertinent data. The permit
application shall be accompanied by the written consent of the owner of lessee of the premises upon which the sign is to be erected and by engineering calculations signed and sealed by a registered design professional where required by the International Building Code and any other applicable ordinance or regulation within this jurisdiction.
C. Changes to Signs. No sign shall be structurally altered, enlarged or relocated except in conformity to the provisions herein, nor until a proper permit, if required, has been secured. The changing or maintenance of movable parts or components of an approved sign that is designed for such changes, or the content of any sign shall not be deemed a structural alteration.
D. Permit Fees. Permit fees to erect, alter or relocate a sign shall be in accordance with the fee schedule adopted within this jurisdiction.