8.01.09 Permits to Comply with Land Use Regulations
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Daniel code is at https://danielutah.gov/code-and-ordinances/.
Text pulled 2026-10-19 from this source.
Title 8 only; a separate 2025 subdivision amendment ordinance is not merged in.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Daniel planning before you rely on it.
(1) Permits shall not be granted for the construction, reconstruction or alteration of any building or structure, or for the moving of a building onto a lot, or for the change of the use of any land, building, or structure if such construction, alteration, moving, or change in use violates any of the provisions of this title.
(2) No sewer service line and/or wastewater treatment facility, no water service line and/or water facility, or electrical utilities shall be installed to serve such premises if such use violates this Title.
8.01.08 Building Permits - Plot Plan Required · 8.01.10 Land Use Verification Certificates