Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Dutch John zoning code

1306 Inspection

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Dutch John code is at https://dutchjohn.gov/documents. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Dutch John planning before you rely on it.
All construction work involving the installation of improvements in subdivisions and developments, which are to be dedicated to public ownership, shall be subject to inspection requirements of the Town of Dutch John. Certain types of construction shall have continuous inspection while others may have only periodic inspections. 1) Continuous inspection is required on the following types of work: a) Laying of street surfacing. b) Pouring of concrete for improvements such as for curb and gutter, sidewalks and other structures. 2) Periodic inspections shall be required on the following: a) Street grading and gravel base b) Excavations for curb and gutter and sidewalks c) Excavations for structures d) Trenches for laying pipe e) Forms for curb and gutter, sidewalks and structures f) Laying of sewer pipe, drainage pipe, water pipe, valves, Fire-hydrants and testing 3) No Work Performed without Inspector On construction requiring continuous inspection, no work shall be done except in the presence of a qualified inspector. All inspections are to be paid for by the developer or contractor and may be undertaken by an Engineer designated by the Town, or by an Inspection service or Engineer approved by the Town Engineer, or by the Town’s Building Inspector if he is qualified to perform the inspection required. 4) Requests for inspection Requests for inspections to be made by the Town’s Building Inspector shall be made to the municipality by the person responsible for the construction, or scheduled with the site engineer, or contract inspection services. 5) Construction completion inspection An inspection shall be made by the Engineer representing the Town of Dutch John after all construction work is completed. This inspection is to be paid for by the Developer/permit holder. Any faulty or defective work shall be corrected by the persons responsible for the work within a period of 30 days of the date of the inspection report of the Engineer representing the Town of Dutch John defining the faulty or defective work. 6) Inspection of Water and Sewer Improvements The Applicant shall arrange for the inspection of water and sewer improvements through the Dutch John water & sewer operating entity. These inspections are to be paid for by the applicant.

1305 Subdivision Improvements · 1307 Development Costs

Ask a broker about Dutch John zoning, free

CallTextFree summary