Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Enterprise zoning code

16-28-030 IMPROVEMENTS: STORM DRAINAGE

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Enterprise code is at https://enterpriseutah.gov/city-ordiances/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Enterprise planning before you rely on it.
A. A storm water drainage system subject to the approval of the City Engineer shall be provided, and shall be separate and independent of any sanitary sewer system. The final plans for the drainage system shall be prepared by a licensed Engineer and approved by the City Engineer. The City upon the advice of the City Engineer may require drainage study based upon a set storm interval to coincide with the City’s current storm water master plan. The City upon the advice of the City Engineer may require on-site storm water detention capabilities in order to not overtax the City storm drainage system. B. No ditch, canal or other waterway or drainage shall be approved as suitable for the use of storm drainage water without the written permission of the appropriate individual or agency. No ditch or canal shall be used for storm water unless adequately improved to handle such water as might be reasonably expected to flow from canal and ditch water, subdivision runoff water, and other water expected to reach such canal or ditch and must be approved by the City Engineer. (Ord. 2002-04, 2002)

16-28-020 IMPROVEMENTS: PERFORMANCE BONDS · 16-28-040 IMPROVEMENTS: STREETS

Ask a broker about Enterprise zoning, free

CallTextFree summary