Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Erda zoning code

27-1 MINING, QUARRY, SAND, AND GRAVEL EXCAVATION ZONE (MG-EX): Purpose

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Erda code is at https://erda.gov/city-codes-and-maps/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Erda planning before you rely on it.
This chapter regulates the location, operations and reclamation of mining, quarries, and gravel pits to provide safe conditions and protection of the environment in Erda. These regulations are to protect the owner, employees, and the public at large. 1. Operation may be approved by the zoning administrator with the minimum requirements. If it is determined by the zoning administrator that the minimum requirements do not adequately mitigate potential or actual impacts to surrounding properties, it shall then be submitted to the planning commission. All commercial pit operations shall work under an approved five-year operation plan. Upon expiration of the previous plan, a new five-year plan shall be submitted; otherwise, closure and reclamation operations shall begin within six months. The conditional use permit shall remain in effect until such time that full reclamation has been made on the site. 2. Temporary project specific operations supply material for specific projects, the termination of which shall also terminate the 3. The mining, quarry, sand, and gravel excavation zone (MG-EX) is a zoning district which allows and protects the mining, quarry, sand, and gravel excavation n industry while protecting the environment. This zone is to assure that the operations of such sites do not impact adjoining uses and are not encroached upon by surrounding non- compatible land uses.

25-7 DRINKING WATER SOURCE PROTECTION OVERLAY ZONE: Public drinking water systems data · 27-2 MINING, QUARRY, SAND, AND GRAVEL EXCAVATION ZONE (MG-EX): Permitted and conditional uses

Ask a broker about Erda zoning, free

CallTextFree summary