11.14 ENGINEERING/GEOLOGIC ANALYSIS
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Fountain Green code is at http://fountaingreencity.gov/government/planning-and-zoning/index.html.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Fountain Green planning before you rely on it.
An engineering geological report shall be prepared by a registered geologist or engineer at the preliminary plan stage of the subdivision to demonstrate that the hillside above any proposed cut will remain stable after the proposed cut/fill and retaining system, if any, has been completed.