Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Millville zoning code

16.16.010 CONCEPT PLAN / SKETCH PLAN (OPTIONAL)

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Millville code is at https://millvilleut.gov/city-government/citycode/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Millville planning before you rely on it.
A.​ If a prospective applicant elects to present a concept plan at a pre-application meeting, the prospective applicant shall present at least eight (8) paper copies and a PDF digital copy of the concept plan, also called a sketch plan, on paper not smaller than 11x17 inches and text of a size and font that is legible and easy to read, to the Commission for an informal review and discussion of the site plan and the general scope and conditions of the proposed subdivision. The concept plan shall include the following: 1.​ The property boundaries of the proposed subdivision as shown on the most current GIS map; 2.​ Names and addresses of adjacent property owners within 600 feet of the proposed subdivision; 3.​ Approximate number of lots proposed and the street layout for the entire property controlled by the developer or the developer’s affiliates to provide an understanding of the full concept for the complete development, even when multiple phases are planned; 4.​ Approximate total acreage of the development as well as lot size range; 5.​ Description of the type of water (culinary and/or irrigation) system proposed along with the water rights pursuant to subsection 16.04.090 of this Title; 6.​ Description of the type of sewer system proposed including the ability to connect to the City’s system, any proposed or necessary lift stations, and expected sewer pipe sizes; 7.​ Present zoning; 8.​ Written description of the stormwater drainage system proposed in compliance with the most current edition of the Cache County Stormwater Design Criteria and Utah Division of Water Quality stormwater permits for both construction and municipal separate storm sewer systems (MS4); 9.​ A written statement describing the intent of the development; 10.​Lots within the hillside development overlay zone. 11.​The City-provided concept plan checklist to verify that all required and necessary information is provided to streamline the process. (Ord. 2025-1, 2025: Ord. 2022-2, 2022: Ord. 2019-6, 2019: Ord. 2008-4, 2008: Ord. 2003-4 §§ 1, 2, 2003: Ord. 2002-2 § 2, 2002: Ord. 2000-17 §§ 2, 3: Ord. 94-3 § 1)

16.12.080 ADMINISTRATIVE LIABILITY · 16.16.015 PHASED DEVELOPMENT

Ask a broker about Millville zoning, free

CallTextFree summary