104-28-2 Stream Corridors, Wetlands, And Shorelines
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Ogden Valley City code is at https://ogdenvalley.gov/municipal-code-2/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Ogden Valley City planning before you rely on it.
a. Reports. At the request of the city, an approved jurisdictional wetland delineation report and concurrence report from the United States Army Corps of Engineers shall be required.
b. Development standards. 1. Setbacks. No structure, accessory structure, road, or parking area shall be built within the required setback from a river or stream as measured from the high water mark of the river or stream. The high water mark shall be determined by the City engineer. The areas within the setback shall be maintained in a manner that protects the quality of water in the river or stream and the habitat of native vegetation and wildlife along the river or stream. a. Structures, accessory structures, roads, or parking areas shall not be developed or located within 100 feet on both sides of the North Fork, South Fork, and Middle Fork of the Ogden River, from the high water mark of the river. b. Structures, accessory structures, roads, or parking areas shall not be developed or located within 75 feet on both sides of year-round streams, as determined from the high water mark of the stream. c. Structures, accessory structures, roads, or parking areas shall not be developed or located within 50 feet from the high water mark of a natural ephemeral stream. d. Structures, accessory structures, roads, or parking areas shall not be developed or located within 100 feet on all sides of Pineview Reservoir, as determined from the high water mark of Pineview Reservoir. 2. Exceptions. a. Bridges or stream alterations approved by the Army Corps of Engineers and state department of natural resources, division of water rights. b. Trails built in conformance to Chapter 40, Ogden Valley Pathways, of the Land Use Code. c. All existing structures, accessory structures, roads, or parking areas prior to the adoption of Ordinance No. 2005-19 River and Stream Corridor Setbacks. d. Structures, accessory structures, roads, or parking areas proposed on a lot with a designated buildable area, building envelope, or river or stream corridor setback shown on the recorded
subdivision plat, recorded prior to January 1, 2006.
3. Stream flow. No work of any kind shall be allowed in a stream corridor or any change that would alter the flow of a stream without a stream channel alteration permit and/or an approved water right from the state department of natural resources, division of water rights.
104-28-1 Purpose And Intent · 104-28-3 Important Wildlife Habitat Areas