Pleasant View zoning code

17.12.010 Building Permit Issuance

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Pleasant View code is at https://www.pleasantviewut.gov/213/Municipal-Code. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Pleasant View planning before you rely on it.
1. Legal Lot Required. The Building Official shall not issue any permit for a proposed building or structure, excluding agricultural buildings (which shall be subject to zoning, sensitive area and other special requirements), on a lot located within the boundaries of the City unless; a. The lot is within a subdivision legally created pursuant to this Ordinance, or prior Subdivision Ordinances, and in accordance with the Development Standards and Specifications. b. The lot is a legal lot of record, such lot being legally created and recorded in the Office of the Weber County Recorder prior to the adoption of this ordinance. c. All required improvements have been properly installed, inspected, and approved by the City Engineer or special approval is granted by the city for granting of permits under partial improvement completions. 2. For the granting of special approval for permits prior to completion of all required improvements, the following minimum standards shall apply, as determined by the city: a. All City utilities shall be installed. All other utilities located under the pavement shall be installed, or conduit(s) in place for future installation. b. The culinary water system has been installed, inspected and approved and the fire hydrants are operational. c. Curb and gutter have been installed. d. Roads are sufficiently completed (with road base installed) to assure continued access for construction and emergency vehicles. e. Sewer systems have been installed, inspected and approved, including all off site connections, so as to be functional upon connection to buildings. f. Storm water facilities are deemed sufficiently operational to prohibit damage to adjacent properties. (Ord.2015-4, dated 4/14/15; prior code: Ord.2008-5, dated 4/8/08)

17.10.080 Site Preparation Work Prohibited · 17.12.020 Building Permit Application

Ask a broker about Pleasant View zoning, free

CallTextFree summary