11-4-3 Final Plat
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official River Heights code is at https://riverheights.gov/river-heights-city-code/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with River Heights planning before you rely on it.
A. Purpose: To provide formal review and approval of the proposed subdivision by the DRC before a subdivision plat is recorded. The final plat and construction plans submitted shall conform in all respects to those regulations and requirements specified during the preliminary plat procedure.
B. Final Plat Review Process:
1. The DRC shall review the final plat and construction plans and determine compliance with all standards and criteria set forth in this ordinance and all other applicable ordinances of the city and the state of Utah.
2. If the DRC determines that the final plat is in conformity with the requirements of this Title, other applicable ordinances, and any reasonable conditions, that all fees have been paid as required, and that the city is satisfied with the final plat of the subdivision, it may approve the final plat.
3. If the DRC determines that the final plat is not in conformity with this title or other applicable ordinances, it may disapprove the final plat specifying the reasons for such disapproval. No final plat shall have any force or effect unless the same has been approved by the DRC, and signed by the city engineer, city attorney, and the mayor.
C. The Review Cycle is Capped:
1. A maximum of three review cycles is permitted during the final plat review process. A review cycle is not considered complete until the applicant has adequately addressed all redlines identified by the municipality. The city may only add new redlines after the first review cycle in response to changes made by the applicant or if a correction is necessary to protect public health or safety, or to enforce state or federal law.
2. The DRC shall complete a review of the plat within forty (40) business days per review cycle after it is submitted for review. If the final plat complies, the city engineer shall sign the plat in the appropriate signature block. If the final plat or the construction plans do not comply, they shall be returned to the developer with comment. (1-2025, 3-18-25)
D. Signing and Recording of Final Subdivision Plat:
The mayor shall endorse approval of the plat after the bond agreement has been approved by the DRC, and all the conditions of the resolution pertaining to the plat have been satisfied. With fully engineered construction drawings approved by the city, an approved final plat shall be recorded in the office of the county recorder.
E. Submittal Process: One PDF digital copy and two (2) full size (24”x36”) and eight (8) reduced size (11”x17”) hard copies of the final plat shall be submitted to the city for ALUA review.
1. Construction Documents Submittal: The applicant shall submit, with the final plat, construction drawings prepared in accordance with city construction specifications. Two (2) copies and one mylar are required to be submitted to the city. The applicant shall also submit an estimate of the cost of construction along with the construction documents.
2. Final Plat Signatures: Upon approval of the construction drawings by the city engineer, he/she shall place their signature on the final plat. Upon receiving approval and signatures from the county board of health (if required), the applicant shall submit the approved plat, after all fees have been paid to the city. If approved by the ALUA, the mayor shall place his or her signature upon the final plat, and at the appropriate time, cause the approved plat to be submitted to the city attorney. After the "security of performance", as defined in section 11-2-1 and described in section 11-5-1 of this title, has been properly posted and the development agreement verified, the city attorney shall place signature upon the final plat and shall have the plat recorded in the county recorder's office solely at the applicant's expense. At the time of recording, the city attorney shall have recorded any and all restrictions placed upon all lots stating that the city will not issue any building permit for the approved subdivision until minimum improvements, as specified in this title, are complete.
F. Final Plat Requirements: The final plat shall comply with the following requirements:
1. Basic Information: The final plat shall be prepared in accordance with the requirements of this title and be:
a. Prepared by a land surveyor, licensed in the state, on Mylar. Other mediums and/or technologies utilized by a land surveyor may be used when approved by the city. The name and contact information of the land surveyor shall be shown on the final plat.
b. Drawn to a scale of not less than one inch equaling one hundred feet (1" = 100') and shall indicate the base heading of true north. The top of the plat shall be either north or east, whichever - accommodates the drawing most effectively.
c. Prepared on a twenty-four inch by thirty-six inch (24" x 36") reproducible mylar medium. It shall have a one and one-half inch (11/2") border on the left side and a one-half inch (1/2") border on the remaining sides.
d. Shown with workmanlike execution in every detail. A poorly drawn or illegible plat is sufficient cause for rejection.
2. Description and Delineation: The final plat shall show the following:
a. The name of the subdivision as approved by the ALUA.
b. Accurate angular and lineal dimensions for all lines, angles and curves used to describe boundaries, streets alleys, easements, setbacks, areas to be reserved for public use and important features.
c. An identification system for all lots, blocks, and names of streets. Lot lines shall show dimensions in feet and hundredths. Metric measurements will become acceptable upon official U.S. government approval of the metric system for all such measurements.
d. The street address for each lot, as assigned by the applicant and approved by the city. The north and west sides of the street shall be numbered odd and the south and east shall be numbered even.
e. True angles and distances to the nearest established street lines of official monuments which shall be accurately described in the plat and shown by the appropriate symbols.
f. Radii, internal angles, points of curvatures, tangent bearings, and the length of all arcs.
g. The accurate location of all monuments to be installed shown by the appropriate symbol. All United States, state, county, or other official benchmarks, monuments, or triangulation stations in or adjacent to the property shall be preserved in precise position.
h. The dedication to the city of all improvements, which shall include, but shall not be limited to, streets, waterworks, sewer works, etc., included in the proposed subdivision.
i. Street monuments installed by the applicant's engineer or land surveyor at points designated on the final plat as approved by the city engineer. Standard precast monuments will be furnished by the applicant and placed as approved.
j. Rebar lot pins shall be shown on the plat and placed at each lot corner in the field prior to final approval.
k. Accurate outlines and dimensions of any areas to be dedicated or reserved for public use, with the purposes indicated thereon, and of any area to be reserved by deed or covenant for the common use of all property owners
l. All boundary, lot, and other geometrics (bearings, distances, curved data, etc.) on the final plat posed to an accuracy of not less than one part in five thousand (1/5000).
m. A statement that all expenses involving the necessary improvements or extensions for a culinary water system, sanitary sewer system, natural gas or other piped in gas, electrical service, telephone service, cable or satellite service, grading and landscaping, storm drainage systems, curbs and
gutters, fire hydrants, pavement, sidewalks, signage, street lighting and other improvements shall be paid for by the applicant.
n. Boundary description of the subdivision.
o. Standard forms for the following, subject to future form revisions and additions when needed or required:
(1) A registered land surveyor's certificate of survey as applicable under state law.
(2) The owner's signature of dedication.
(3) A notary public's acknowledgment.
(4) The city engineer's certificate of approval. The city engineer shall serve as the culinary water and sanitary sewer authority.
(5) The county board of health's certificate of approval if a septic tank system is used for sewage disposal.
(6) The city's signature of approval by the mayor.
(7) The city attorney's certificate of approval.
(8) The county surveyor's certificate of approval.
(9) The county recorder's stamp of approval according to requirements prior to final plat approval.
3. Conditions, Covenants and Restrictions (CCRs): CCRs, together with the final plat, shall be approved by the ALUA. The CCRs will thereupon be recorded with the final plat.
4. Building Lots and Building Permits: Building lots in the approved subdivision may be sold after the final plat has been recorded. The lots, however, shall have recorded restrictions placed upon them stating that the city will not issue any building permit for any lot until minimum improvements, as specified by city ordinance, are complete. A building permit may be issued, however, if a waiver is signed stating that the city has no liability or responsibility to the applicant.
5. Subdivision Completion Agreement: The applicant shall enter into and sign an agreement, after the security of performance has been properly posted, which shall indicate a timetable for completion of minimum and final improvements.
(6-2024-11-19-24)