3.16.4 Standards and Requirements
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Wallsburg code is at https://wallsburg.gov/development-code/.
Text pulled 2026-10-19 from this source.
The chapters the town posts pre-date revisions it approved in June 2023, September 2023 and February 2024, which aren't posted as clean text. Check those changes with the town.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Wallsburg planning before you rely on it.
A temporary use established under the provisions of this Chapter shall conform to the following standards and requirements:
1. Any structure requiring sanitary facilities by building, fire, health, or other similar codes shall be located on the same lot as a host structure unless independent water and sewer service is provided to the temporary structure. Where such codes require sanitary facilities, they may be provided if there is:
a) No preparation of any food on the premises.
b) No indoor seating of patrons.
c) Written evidence that a host structure will provide permanent sanitary facilities for any employees and that such facilities are conveniently located not more that three hundred (300) feet from the structure and will be accessible during all periods of operation of the use.
d) Written evidence from the Town or County Health Department that all food will be prepared and delivered from an approved commissary and that all waste resulting from the operation of the use will be properly disposed.
2. Parking, access, circulation, and other significant elements of any other uses or structures existing on the site shall be handled on a case by case basis. Approval for each temporary use permit shall bear an expiration date based upon the nature of the use. In no case shall approval be given for a period exceeding thirty (30) days. Garage sales need not obtain a Temporary Use permit, but shall not operate the sale for a period exceeding five (5) days in any calendar year, and shall be conducted by bona fide residents or lessors of the premises. If any temporary structure becomes vacant prior to the expiration of the permit, it shall be removed within fifteen (15) days of the vacancy.
3. The landowner of the parcel shall provide a cash bond for the restoration of the site of said use to its original condition, including cleanup, replacement of facilities, and removal of any structures in an amount determined by the Planning Commission.
3.16.3 Prior Approval Required · 3.16.5 Revocation of Permit