14-3-6 ISSUANCE OF BUILDING PERMITS AND CERTIFICATES OF OCCUPANCY

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Wellington code is at https://www.wellingtonutah.gov/land-use-code.html. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Wellington planning before you rely on it.
1. Where a performance bond has been required for a subdivision, no certificate of occupancy for any building in the subdivision shall be issued prior to the completion of the improvements and dedication of same to the City, as required in the Planning and Zoning Commission's final approval of the subdivision plat. 2. The extent of street improvement shall be adequate for vehicular access by the prospective occupant and by the police and fire equipment, prior to the issuance of an occupancy permit. The developer shall at the time of the dedication submit monies in escrow to the City in a sum determined by the City Engineer for the necessary final improvement of the street. 3. No building permit shall be issued for the final ten percent (10%) of lots in a subdivision, or if ten percent (10%) be less than two (2), for the final two (2) lots of a subdivision, until all public improvements required by the Planning and Zoning Commission for the plat have been fully completed and dedicated to the City.

14-3-5 DEFERRAL OR WAIVER OF REQUIRED IMPROVEMENTS · 14-3-7 CONSUMER PROTECTION LEGISLATION

Ask a broker about Wellington zoning, free

CallTextFree summary