Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Wellington zoning code

14-4-5 WATER FACILITIES

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Wellington code is at https://www.wellingtonutah.gov/land-use-code.html. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Wellington planning before you rely on it.
1. GENERAL REQUIREMENTS. a. Necessary action shall be taken by the applicant to extend or create a water-supply district for the purpose of providing a water-supply system capable of providing domestic water use and fire protection. b. Where a public water main is accessible the subdivider shall install adequate water facilities (including fire hydrants) subject to the specifications of the State or local authorities. All water mains shall be at least eight (8) inches in diameter. c. Water main extensions shall be approved by the officially designated agency of the State or City. d. To facilitate the above, the location of all fire hydrants, all water supply improvements, and the boundary lines of proposed districts, indicating all improvements proposed to be served, shall be shown on the preliminary plat, and the cost of installing same shall be included in the performance bond to be furnished by the developer. INDIVIDUAL WELLS AND CENTRAL WATER SYSTEMS. a. In low-density zoning districts, in the discretion of the Planning and Zoning Commission, if a public water system is not available, individual wells may be used or a central water system provided in such a manner that an adequate supply of potable water will be available to every lot in the subdivision. Water samples shall be submitted to the Health Department for its approval, and individual wells and central water systems shall be approved by the appropriate health authorities. Orders of approval shall be submitted to the Planning and Zoning Commission. b. If the Planning and Zoning Commission requires that a connection to a public water main be eventually provided as a condition to approval of an individual well or central water system, the applicant shall make arrangements for future water service at the time the plat received final approval. Performance or cash bonds may be required to insure compliance. FIRE HYDRANTS. Fire hydrants shall be required for all subdivisions except those coming under Section 4.5(2). Fire hydrants shall be located no more than 500 feet apart and within 250 feet of any structure and shall be approved by the applicable protection unit. To eliminate future street openings, all underground utilities for fire hydrants, together with the fire hydrants themselves and all other supply improvements shall be installed before any final paving of a street shown on the subdivision plat.

14-4-4 DRAINAGE AND STORM SEWERS · 14-4-6 SEWERAGE FACILITIES

Ask a broker about Wellington zoning, free

CallTextFree summary