10-8-6 FINANCIAL ASSURANCE
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Wendover code is at https://wendovercityutah.com/planning-%26-zoning.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Wendover planning before you rely on it.
1.
Improvement installation guarantee:
a.
In lieu of actual installation of off-site and common open space improvements required by
this chapter, and before final plat approval by the City council, the subdivider shall
guarantee the installation of such improvements by one or a combination of the following
financial guarantee methods: a corporate surety bond, a deposit in escrow with an escrow
holder or a letter of credit with a financial institution.
b.
The guarantee shall be in an amount equal to 120% of the projected costs of required
improvements as estimated by a licensed engineer retained by the subdivider and approved
by the City engineer. The guarantee shall assure the actual construction of such
improvements within two years immediately following the approval of the final plat by the
City council and shall include a maintenance guarantee as required herein.
c.
The guarantee shall be filed with the City recorder.
d.
The guarantee shall be approved as to method, institution and form by the City attorney.
2.
Default: In the event the subdivider defaults or fails or neglects to satisfactorily install required
improvements within two years from date of approval of the final plat, the City council may declare
the bond, escrow, deed of trust, or letter of credit forfeit and may execute thereon and install or
cause the required improvements to be installed using the proceeds from the collection to defray the
expenses thereof. The subdivider shall be responsible for all costs incurred by the City to complete
the required improvements in excess of the proceeds of the guarantee amount.
3.
Maintenance guarantee: The subdivider shall guarantee all off-site improvements will remain in
good condition for a period of two year after the date of final acceptance by the City. The
subdivider shall make all repairs to and maintain the improvements in good condition during that
two-year period at no cost to the City. Upon completion of the improvements, the City shall retain
at least 20% of the guarantee for a surety to cover the maintenance period. The exact amount
retained shall be determined by the City public works director. Identifying necessary repairs and
maintenance rests with the City public works director, whose decision upon the matter shall be final
and binding upon the subdivider. The guarantee shall extend to and include, but shall not be
limited to the entire street, subgrade, base, and surface and all pipes, joints, valves, backfill and
compacting as well as the working surface, curbs, gutters, sidewalks, and other accessories that are,
or may be, affected by construction operations. Whenever, in the judgment of the City public
works director, the improvements shall need repairs, maintenance, or re-building, the City public
works director shall cause a written notice to be mailed or given to the subdivider. Upon receipt,
the subdivider shall undertake and complete such repairs, maintenance or re-building within the
times required by the public works director. If repairs are not completed within the specified time,
the City shall have such repairs made and the cost of such repairs shall be paid by the subdivider or
by the City using the guarantee. The subdivider has the right to appeal the time limit that it was
given to complete the repairs, to the City Council, provided a written appeal is received by the City
Council prior to the expiration of the repair period.
4.
Acceptance and release of surety:
a.
The subdivider shall submit to the City a copy of the as-built construction drawings.
Acceptance of all improvements shall be in writing from the City engineer.
b.
Final inspection by the City public works director shall be made two year after all work
has been completed and before release of the guarantee. All defects shall be corrected
before acceptance by the City.
c.
Upon completion of off-site improvements and approval by the City public works director,
the financial assurances may be released, at which time the subdivision will be deemed
accepted.
5.
Engineering review and inspection fee: In addition to the improvement and maintenance
guarantee, the subdivider shall deposit with the City recorder a sum equal to five percent of the cost
of the improvements to cover engineering review and public works inspection.