17.10.040 SITE DEVELOPMENT STANDARDS
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Cache County code is at https://www.cachecounty.gov/assets/department/clerk/cachecountyut-ut-2.pdf.
Text pulled 2026-10-19 from this source.
Titles 16 and 17 only, from the PDF on the county's own website (prepared by its code publisher; publisher notes removed).
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Cache County planning before you rely on it.
Table 17.10.040 of this section lists the site development standards that apply within all zoning districts. These are "base" standards, not entitlements. Other regulations of the land use ordinance, the subdivision ordinance, other applicable County ordinances and policies, requirements imposed as conditions of permitting, or requirements from other local, State, and Federal agencies may impose other development standards.
TABLE 17.10.040
SITE DEVELOPMENT STANDARDS
Use Type:
Primary
Accessory
Both
Use setback distances: Front yard Multi-street frontage
Side yard
Rear yard
Structures on same lot From the top of a recognized irrigation canal bank to any structure or fence Other standards: Maximum structure height2
Base Zoning Districts
RU2
RU5
Base Zoning Districts
RU2
RU5
30' 30' 12' 5' 30' 5' 10'
16.5'
30' 30' 12' 5' 30' 5' 10'
16.5'
35'
35'
A10
A10
30' 30' 12' 5' 30' 5' 10' 16.5'
35'
FR40
FR40
C
50' 50' 20' 5' 30' 5' 10'
16.5'
30' 30' 30' 1 30' 1 10'
16.5'
C
I
I
30' 30' 30' 1 30' 1 10'
16.5'
35'
40' 35' 40' 35'
Minimum lot size
Maximum density3 Maximum lot coverage Minimum lot frontage
1/2 acre 1U/2A 60% 90'
1/2 acre 1U/5A 60% 90'
1/2 acre 1U/10A 60% 90'
1 acre
1U/40A 25% 150'
1/2 acre 2U/A 50% 150'
1 acre
n/a 50% 150'
Notes:
1. Setback may be reduced to 15 feet with a conditional use permit if the adjoining parcel is zoned commercial or industrial.
2. Maximum height for agricultural structures is 45 feet. Also see definition of "building height, maximum", at section 17.07.040, "General Definitions", of this title.
3. The Land Use Authority shall have the authority to determine the total number of acres eligible for residential density (developable acreage).
17.10.030 DEVELOPMENT DENSITY AND STANDARDS SPECIFIC TO BASE ZONING DISTRICTS · 17.10.050 SUPPLEMENTAL STANDARDS