Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Enterprise zoning code

16-24-020 FINAL PLAT: DESCRIPTIONS AND DELINEATIONS, ETC

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Enterprise code is at https://enterpriseutah.gov/city-ordiances/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Enterprise planning before you rely on it.
The final plat shall show: A. The name of the subdivision, which name must be approved by the City and the County Recorder. B. Accurate angular and lineal dimensions for all lines, angles and curves used to describe boundaries, streets, alleys, easements, areas to be reserved for public use and other important features; C. An identification system for all lots and blocks and names of streets. Lot lines shall show dimensions in feet and hundredths; D. True angles and distances to the nearest established street lines or official monuments, which shall be accurately described in the plat and shown by appropriate symbol; E. Radii, internal angles, points and curvatures, tangent bearings and the length of all arcs; F. The accurate location of all monuments and fire hydrants to be installed shown by the appropriate symbol. All United States, state, county, or other official benchmarks, monuments, or triangulation stations in or adjacent to the property shall be preserved in precise position; G. The dedication to the City of all streets and highways included in the proposed subdivision. Street monuments shall be installed by the subdivider's Engineer or land surveyor at such points designated on the final map as are approved by the City Engineer. Standard precast monuments will be furnished by the subdivider and must be placed prior to the release of the improvement bond; H. Capped rebar or other such permanent physical markers as shall be placed at each lot corner; I. Accurate outlines and legal descriptions of any areas to be dedicated or reserved for public use, with the purposes indicated thereon, and of any area to be reserved by deed or covenant for common uses of all property owners; J. Where it is proposed that streets be constructed on property controlled by a public agent or utility company, approval for the location, improvement, and maintenance of such streets shall be obtained from the public agency or utility company and entered on the final plat in a form approved by the City attorney. (Ord. 2002-04, 2002)

16-24-010 FINAL PLAT: PREPARATION · 16-24-030 FINAL PLAT: STANDARD FORMS

Ask a broker about Enterprise zoning, free

CallTextFree summary