16-36-050 IMPACT FEES, ENFORCEMENT, PERMITS, AND PENALTIES: ACTUAL ASSESSMENT OF IMPACT FEES
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Enterprise code is at https://enterpriseutah.gov/city-ordiances/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Enterprise planning before you rely on it.
A. Electrical Power Impact Fee:
The City hereby assesses the following amount for the Electrical Power Impact Fee:
The impact fee for Enterprise City is based on $1,510.00 per kVA of load added to the system.
The estimated kW loads for residential customers shown below are adjusted for Power Factor, which is
assumed to be 85% (uncompensated). The impact fees for residential customers have been calculated in
the following table. These calculations are based upon historical usage as tabulated in the 2007 Impact Fee
Study.
Residential:
Rate Schedule Est. kW Impact Power Factor Est. kVA Impact Impact Fee
Residential (100 Amp*) 1.84
85.00%
2.17
$ 3,275.00
Residential (200 Amp*) 2.25
85.00%
2.65
$ 4,000.00
Residential (400 Amp*) 8.79
85.00%
10.34
$15,610.00
*NOTE: Calculations are based on typical usage, rather than on electrical panel size.
Commercial:
For small commercial customers (200 Amps or less, single phase), the following flat rate shall apply:
Rate Schedule
Impact Fee
Commercial (100 Amp Panel/120/240 Volts Max) $3,275.00
Commercial (200 Amp Panel/120/240 Volts Max) $4,000.00
All other commercial customers are assessed an impact fee amount that is based on their estimated load on
the system. The fee for commercial customers is calculated by multiplying the panel rating (in amps), times
the line-to-line voltage, times the square root of three, times the utilization factor (0.5), times the system
diversity factor (0.4), times the commercial rate per kVA (see the examples below).
Rate Schedule
Demand Adjusted Demand Impact Fee
Commercial
7.2
$10,870.00
(100 Amp Panel/120/208Y Volts)
Commercial
14.4
$21,740.00
(200 Amp Panel/120/208Y Volts)
Commercial (400 Amp) 144
28.8
$43,480.00
(400 Amp Panel/120/208Y Volts)
B. Wastewater Development Impact Fee:
The City hereby assesses the following amount for the Wastewater Development Impact Fee:
$2,500.00
C. Culinary Water Development Impact Fee:
The City hereby assesses the following amount for the Culinary Water Development Impact Fee: $4,300.00
D. Storm Drainage Impact Fee: The City hereby assesses the following amount for the Storm Drainage Impact Fee: $0.00 (None)
E. Roads and Streets Impact Fee: None
F. Parks and Recreational Impact Fee: The City hereby assesses the following amount for the Parks and Recreation Impact Fee to all new residential Development Activity (commercial Development Activity will not incur an impact fee): $1,500.00
G. Public Safety Impact Fee:
The City hereby assesses the following amount for the Public Safety Impact Fee: $425.00
16-36-040 IMPACT FEES, ENFORCEMENT, PERMITS, AND PENALTIES: CALCULATION OF THE MAXIMUM ALLOWABLE IMPACT FEES · 16-36-060 IMPACT FEES, ENFORCEMENT, PERMITS, AND PENALTIES: TIME OF COLLECTION