Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Fruit Heights zoning code

10-17-6 RESIDENTIAL DAYCARE OR GROUP INSTRUCTION

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Fruit Heights code is at https://www.fruitheights.gov/201/Municipal-Code. Text pulled 2026-10-19 from this source. Partial copy: about 20 chapters (most zone and administration chapters, ch. 1-7, 8A-8C, 8E, 9A-9B, 10B, 12-15, 19-20) are scanned images on the city's site and are not included. Use the official code for those. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Fruit Heights planning before you rely on it.
The following conditions shall apply only to home occupation licenses for residential daycare or group instruction: A. Use Of Rear Yard: The rear yard may be used for outside play area or instruction. B. State License And Compliance With Regulations: Residential daycare facilities shall comply with all regulations of the state and shall be licensed by the state. C. Group Instruction Sessions: Residential group instruction (preschools) shall be limited to no more than six (6) children in each session who are not residents of the home. There shall be no more than two (2) sessions per day and each session may not exceed four (4) hours. No child or person may attend more than one session per day. D. Minimum Floor And Outdoor Play Area For Daycare: A minimum interior floor area of thirty five (35) square feet and a minimum secured outdoor play area of forty (40) square feet per child shall be provided for residential daycare facilities. E. Total Floor Area: Total floor area used for residential daycare or group instruction may be no more than twenty five percent (25%) of the ground floor area of the residence. F. Inspection: An annual inspection for continued compliance will be required for license renewal of all residential daycare and group instruction facilities. (Ord. 2008-11, 122-2008)

10-17-5.1 CONDITIONAL USE PERMIT REQUIREMENTS · 10-17-7 HOME OCCUPATION PERMIT APPLICATION PROCEDURES

Ask a broker about Fruit Heights zoning, free

CallTextFree summary