11E-511 Sewers
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Garden City code is at https://www.gardencityutah.gov/code.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Garden City planning before you rely on it.
A.
All subdivision sewer systems within the Town area of impact shall be
connected to a public sewer system provided that such service is available. Septic
sewer systems will be allowed upon approval by the Bear River District Health
Department. Construction plans and specifications for central sanitary sewer
extension shall be prepared by the subdivider and approved by the Town
engineer, Council, the Bear Lake Special Service District, and Utah Health
Department prior to final plat approval.
The central collection system shall be constructed throughout the entire
subdivision to carry off water from all inlets and catch basins, and shall be
connected to an adequate outfall. A storm water drainage system subject to the
approval of the Planning Commission shall be provided, and shall be separate and
independent of the sanitary sewer system. The final plans for the drainage system
shall be prepared by a licensed engineer.
B. Storm Drainage - No ditch or canal shall be approved as suitable for the use of
storm drainage water without the written permission of the appropriate ditch,
canal company, or of the water users for such use. No ditch or canal shall be used
for storm water unless adequately improved to handle such water as might be
reasonably expected to flow from canal and ditch water, subdivision runoff water, and other water expected to reach such canal or ditch.
11E-510 Block Requirements A · 11E-512 Water All subdivisions/developments or commercial uses wanting to