Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Garden City zoning code

11E-512 Water All subdivisions/developments or commercial uses wanting to

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Garden City code is at https://www.gardencityutah.gov/code. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Garden City planning before you rely on it.
Water All subdivisions/developments or commercial uses wanting to maintain private access must provide a compound/bulk meter and comply with the specifications as outlined by the Garden City Public Works Standards Specifications & Drawings. Connection to the Town of Garden City water system is required for all lots, unless other arrangements for water have been made and approved by the Garden City Town Council. All water connections are subject to the approval of the Garden City Town Council upon recommendation from the Town Water Rights Engineer and the Town of Garden City Public Works Department. All applications for water or submittal of water rights to the Town will be made to the Town Water Rights Engineer. The subdivider shall also be required to locate and install an adequate number of fire hydrants within the proposed subdivision according to specifications and requirements of the City under the supervision of the Garden City Fire District and other regulatory agencies having jurisdiction thereover. All water systems installed shall be looped extensions and no dead-end systems shall be permitted. All water systems in an area of Town impact shall be connected to the municipal water system and shall meet the standards of all required agencies. The subdivider will furnish to the Planning Commission a complete mapping system of all water lines, fire hydrants, water meters, and water tanks that will be constructed throughout the entire subdivision. This mapping system will include; line size/s, hydrant location/s, meter size/s and location/s, valve/s and location/s, pump station/s and specific pump size/s, tank location/s and size/s, and bulk meter location/s if applicable. All electric that will be needed for the water system will be included. A construction easement and maintenance easement will be identified in the mapping system. The subdivider will work in accordance with the Town engineer to meet the Town water system requirements. Fire hydrant requirements and flow measures will be handled through the Garden City Fire District.

11E-511 Sewers · 11E-513 Utilities In addition to the terms mentioned hereinabove

Ask a broker about Garden City zoning, free

CallTextFree summary