Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Garden City zoning code

11E-513 Utilities In addition to the terms mentioned hereinabove

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Garden City code is at https://www.gardencityutah.gov/code. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Garden City planning before you rely on it.
Utilities In addition to the terms mentioned hereinabove, all utilities including but not limited to, electricity, natural gas, telephone, and cable serves shall be installed underground as a required improvement by the subdivider. Adequate provision for expansion of such services within the subdivision or to adjacent lands including installation of conduit pipe across and underneath streets shall be installed by the subdivider prior to construction of street improvements. A. Rocky Mountain Power’s electrical distribution system policy for developers in residential developments (subdivisions) based on Tariff No. 43, Electrical Regulation No. 12, Line Extensions. B. For all lots the Power Company designs the electrical system based on the plat map. The developer is responsible for all trenching and transformer pads, junction boxes, switching cabinets and any other equipment foundations or pads for underground equipment. C. In developments where transformer placement can be determined prior to homes being built (generally lots up to one acre in size) the developer pays to make secondary voltage service (120/240 volt single-phase) available to each lot. For underground systems the secondary voltage at the lot line may be at either: the secondary lugs of the transformer; or, if the transformer does not border the lot, a secondary junction box. The cost of the service from the lot line to the home is the individual lot owner’s responsibility. D. In developments where transformer placement can not be determined prior to homes being built (generally lots over one acre in size) the developer pays to make primary service available to each lot. The cost of extending the primary onto the lot, and transformer and service necessary to serve each home is the individual lot owner’s responsibility. E. The Phone system will be in compliance with local communications provider.

11E-512 Water All subdivisions/developments or commercial uses wanting to · 11E-514 Street Improvement Requirements A

Ask a broker about Garden City zoning, free

CallTextFree summary