20.19.05 FENCING/ACCESS REQUIREMENTS
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Genola code is at https://genolaut.gov/zoning-code/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Genola planning before you rely on it.
All Alternative Energy Source towers over 12 ft. tall shall be protected by EITHER a lockable perimeter fence at least 6 ft. tall OR the climbing apparatus for the tower be located at least 12 ft. above the base of the structure.
20.19.04 PERMIT APPLICATION · 20.19.06 CONNECTION RESTRICTIONS