The following documents shall accompany the Preliminary Plan when deemed necessary by the City Engineer:
1. Soils Report. The applicant shall provide a detailed soils report addressing the following issues for the subdivision: hill stabilization, road design including CBR or existing soils, foundation design, groundwater impacts, and general soil stability. The report must be stamped and signed by a Civil Engineer licensed in the state of Utah. The report shall include a minimum groundwater height factor for a peak month in a wet year for the lowest buildable floor elevation. The lowest buildable floor elevation shall be a minimum of three (3) feet above the highest groundwater level in a wet year. Foundation drains shall be required depending on the recommendations based on the GeoTech report.
2. Storm Water Plan. The applicant shall provide a detailed storm water plan for the subdivision. Plans and calculations shall be stamped and signed by a civil engineer licensed in the state of Utah.
3. Wetland Delineation Study. If there are potential wetlands in a development the applicant shall submit a wetlands delineation by a qualified wetlands scientist. This delineation will be reviewed by a qualified wetlands scientist hired by the City. All costs for the delineation and review shall be borne by the applicant.