Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Utah zoning codes · Sanpete County

Moroni zoning

Where to find Moroni's official zoning rules, and who to ask.

Searchable here: an unofficial copy of Moroni's Title 10 - Zoning (245 sections), pulled 2026-10-19 from its official website. It may be out of date; the official code controls.

Sections

  1. 10-1-1 Short Title
  2. 10-1-2 Purpose
  3. 10-1-3 Conflicting Provisions
  4. 10-1-4 Interpretation
  5. 10-1-5 Amendments
  6. 10-2-1 Definitions
  7. 10-3-1 Enforcement
  8. 10-3-2 Zoning and Building Permits, Plans
  9. 10-3-3 Licensing
  10. 10-3-4 Amendments to
  11. 10-3-5 Penalty
  12. 10-4A-1 Purpose
  13. 10-4A-2 Permitted and Conditional Uses
  14. 10-4A-3 Lot Area
  15. 10-4A-4 Lot Width
  16. 10-4A-5 Lot Frontage
  17. 10-4A-6 Legal Non-Conforming Lots and Structures
  18. 10-4A-7 Lot Area per Dwelling
  19. 10-4A-8 Yard Requirements
  20. 10-4A-9 Projections into Yards 1. Permitted
  21. 10-4A-10 Building Height
  22. 10-4A-11 Distance
  23. 10-4A-12 Parking, Loading and Access
  24. 10-4A-13 Site Plan Approval
  25. 10-4A-14 Other Requirements
  26. 10-4B-1 Purpose
  27. 10-4B-2 Permitted and Conditional Uses
  28. 10-4B-3 Lot Area
  29. 10-4B-4 Lot Width
  30. 10-4B-5 Lot Frontage
  31. 10-4B-6 Legal Non-Conforming Lots and Structures
  32. 10-4B-7 Lot Area per Dwelling
  33. 10-4B-8 Yard Requirements
  34. 10-4B-9 Projections into Yards
  35. 10-4B-10 Building Height
  36. 10-4B-11 Distance
  37. 10-4B-12 Parking, Loading and Access
  38. 10-4B-13 Site Plan Approval
  39. 10-4B-14 Other Requirements
  40. 10-4C-1 Purpose
  41. 10-4C-2 Permitted and Conditional Uses
  42. 10-4C-3 Lot Area
  43. 10-4C-4 Lot Width
  44. 10-4C-5 Lot Frontage
  45. 10-4C-6 Legal Non-Conforming Lots and Structures
  46. 10-4C-7 Lot Area per Dwelling
  47. 10-4C-8 Yard Requirements
  48. 10-4C-9 Projections into Yards
  49. 10-4C-10 Building Height
  50. 10-4C-11 Distance
  51. 10-4C-12 Parking, Loading and Access
  52. 10-4C-13 Site Plan Approval
  53. 10-4C-14 Other Requirements
  54. 10-4D-1 Purpose and Intent
  55. 10-4D-2 Use Regulations
  56. 10-4D-3 Area Regulations
  57. 10-4D-4 General Requirements
  58. 10-4D-5 Submission of Application
  59. 10-4D-6 Planning Commission Consideration
  60. 10-4D-7 Planning Commission Action
  61. 10-4D-8 City Council Action
  62. 10-4D-9 Building Permit Issuance
  63. 10-4D-10 Time Limit
  64. 10-5A-1 Purpose and Objectives
  65. 10-5A-2 Permitted and Conditional Uses
  66. 10-5A-3 Lot Area
  67. 10-5A-4 Lot Width
  68. 10-5A-5 Lot Frontage
  69. 10-5A-6 Legal Non-Conforming Lots and Structures
  70. 10-5A-7 Yard Requirements
  71. 10-5A-8 Projections into Yards
  72. 10-5A-9 Building Height
  73. 10-5A-10 Distance Between Buildings
  74. 10-5A-11 Permissible Lot Coverage
  75. 10-5A-12 Parking, Loading and Access
  76. 10-5A-13 Site Plan Approval
  77. 10-5A-14 Other Requirements
  78. 10-5B-1 Purpose and Objectives
  79. 10-5B-2 Permitted and Conditional Uses
  80. 10-5B-3 Lot Area
  81. 10-5B-4 Lot Width
  82. 10-5B-5 Lot Frontage
  83. 10-5B-6 Prior Created Lots
  84. 10-5B-7 Yard Requirements
  85. 10-5B-8 Projections into Yards
  86. 10-5B-9 Building Height
  87. 10-5B-10 Distance Between Buildings
  88. 10-5B-11 Permissible Lot Coverage
  89. 10-5B-12 Parking, Loading and Access
  90. 10-5B-13 Site Plan Approval
  91. 10-5B-14 Other Requirements
  92. 10-6-1 Purpose and Objectives
  93. 10-6-3 Lot Area
  94. 10-6-4 Lot Width
  95. 10-6-6 Prior Created Lots
  96. 10-6-7 Area of Zone
  97. 10-6-8 Yard Requirements
  98. 10-6-9 Projections into Yards
  99. 10-6-10 Building Height
  100. 10-6-11 Distance Between Buildings
  101. 10-6-12 Permissible Lot Coverage
  102. 10-6-13 Parking, Loading and Access
  103. 10-6-15 Other Requirements
  104. 10-7-1 Purpose and Intent
  105. 10-7-2 Permitted Uses
  106. 10-7-3 Development Restrictions
  107. 10-7-5 Review and Approval Process
  108. 10-8-1 Purpose
  109. 10-8-2 Establishment of Uses Not Specified
  110. 10-8-4 Public Utilities; Exceptions
  111. 10-8-5 Location of Boats, Boat Trailers and Travel Trailers
  112. 10-8-7 Height Limitation; Exceptions
  113. 10-8-9 Minimum Yard Areas to
  114. 10-8-10 Side Yard Modification; Combined Lots
  115. 10-8-11 Front Yard Modifications; Developed Areas
  116. 10-8-12 Minimum Lot Area to
  117. 10-8-13 Minimum Lot Area; Portion for Public Use
  118. 10-8-14 Lot Area Reduction; Public Use
  119. 10-8-16 Parking Requirements
  120. 10-8-17 Effect of Street Plan
  121. 10-8-18 Swimming Pools
  122. 10-8-19 Adult Entertainment Businesses Prohibited
  123. 10-10-1 Purpose
  124. 10-10-2 Definition
  125. 10-10-3 Policies, Procedures and Consideration Generally Described
  126. 10-10-4 Permit Required
  127. 10-10-5 Application
  128. 10-10-8 Appeals
  129. 10-10-9 Expiration
  130. 10-10-10 Modification or Revocation of Permit
  131. 10-11-1 Purpose
  132. 10-11-2 Uses Allowed
  133. 10-11-3 Permit,
  134. 10-11-4 Action of Planning Commission
  135. 10-12-1 Non-Conforming Use Defined
  136. 10-12-2 Use of Open Land
  137. 10-12-4 Non-Conforming Use of Conforming Buildings
  138. 10-12-5 Non-Conforming Use of Non-Conforming Buildings
  139. 10-12-6 Change in Status of Non-Conforming Use
  140. 10-12-7 Reconstruction of Non-Conforming Building Partially Destroyed
  141. 10-11-8 Non-Conforming Limited to Zone Groups
  142. 10-12-9 Non-Conforming Detrimental to Health and Safety
  143. 10-13-1 Purpose
  144. 10-13-2 Definitions
  145. 10-13-4 Lighting Standards
  146. 10-13-5 Lighting Plan Required
  147. 10-13-6 Right-of-Way Lighting
  148. 10-13-7 Conflicting Provisions
  149. 10-14-1 Purpose
  150. 10-14-2 Residential Zones
  151. 10-14-3 Commercial and Manufacturing Zones
  152. 10-14-4 General Provisions
  153. 10-14-5 Temporary Signs
  154. 10-14-6 Nonconforming Signs
  155. 10-14-7 Enforcement
  156. 10-15-1 Permit Required
  157. 10-15-2 Procedure
  158. 10-15-3 Conditions
  159. 10-15-5 Appeal
  160. 10-15-6 Business License Required
  161. 10-16-1 Statutory Authorization, Findings of Fact, Purpose and Methods
  162. 10-16-2 Definitions
  163. 10-16-3 General Provisions
  164. 10-16-4 Administration
  165. 10-16-5 Provisions for Flood Hazard Reduction
  166. 10-16-6 Certification
  167. 10-17-1 Definitions
  168. 10-17-2 Certain Conduct Unlawful
  169. 10-17-3 Hives on Residential Lots
  170. 10-17-4 Beekeeper Registration
  171. 10-17-5 Hives
  172. 10-17-7 Water
  173. 10-17-8 Beekeeping Equipment
  174. 10-17-9 Conflict with County or Health Department Regulations
  175. 10-17-10 Violations
  176. 10-18-1 Definition
  177. 10-18-2 Use
  178. 10-18-3 Violation of Ordinance
  179. 10-19-1 Table
  180. 10-19-2 Table B: Off-Street Parking Requirements
  181. 10-19-4 Exhibit B
  182. 11-1-5 Simple Lot Subdivisions
  183. 11-1-6 Subdivisions
  184. 11-1-6.20 Process
  185. 11-1-6.25 Concept Plan
  186. 11-1-6.30 Preliminary Plan
  187. 11-1-7 Subdivision Standards
  188. 11-1-8 Plat Amendments and Boundary Line Adjustments
  189. 11-1-1 Purpose
  190. 11-1-2 Approval Required
  191. 11-1-3 Sub-divider to Contact City Officials
  192. 11-1-4 Exemptions from Plat Requirements
  193. 11-1-4.10 Properties for Agricultural, Open Space, or Conservation Purposes
  194. 11-1-4.15 Simple Lot Subdivisions
  195. 11-1-5.10 Purpose
  196. 11-1-5.15 Applicability
  197. 11-1-5.20 Filing Simple Lot Subdivision Record of Survey
  198. 11-1-5.25 Required Conditions
  199. 11-1-5.30 Submittal Contents
  200. 11-1-5.35 Site Specific Contents
  201. 11-1-5.40 Review and Approval Process
  202. 11-1-5.45 Filing the Record of Survey
  203. 11-1-5.50 Expiration of the Final Approval
  204. 11-1-6.10 Purpose
  205. 11-1-6.15 Applicability
  206. 11-1-6.20.10 Procedure
  207. 11-1-6.20.15 Preliminary
  208. 11-1-6.20.20 Approval of Land Use Authority
  209. 11-1-6.25.1 Processes and
  210. 11-1-6.25.2 Review Process-Concept
  211. 11-1-6.30.10 Purpose
  212. 11-1-6.30.15 Pending Ordinance
  213. 11-1-6.30.20 Contents
  214. 11-1-6.30.25 Site Specific Contents
  215. 11-1-6.30.30 Conditions for Review
  216. 11-1-6.30.35 Review Cycles
  217. 11-1-6.35.10 Purpose
  218. 11-1-6.35.15 Application Process
  219. 11-1-6.35.20 Contents
  220. 11-1-6.35.25 Completing a Final Plat Review
  221. 11-1-6.35.30 Performance Bond
  222. 11-1-6.35.35 Copy of Owner's Payment Required
  223. 11-1-6.35.40 Plat Recordation
  224. 11-1-7.10 Design and Documentation Requirements
  225. 11-1-7.15 Improvement Requirements
  226. 11-1-7.20 Subdivision Costs and Charges
  227. 11-1-7.25 Standards and Specifications
  228. 11-1-7.30 Street Design
  229. 11-1-7.35 Lots
  230. 11-1-7.40 Public Use and Service Areas
  231. 11-1-7.45 Suitability of Land
  232. 11-1-7.50 Access To Lots
  233. 11-1-7.55 Processing Fees
  234. 11-1-7.60 Drawings Required
  235. 11-1-7.65 Variances
  236. 11-1-7.70 Park Fees and Park Development
  237. 11-1-7.75 Donation, Gifting or Procurement of Land for Parks
  238. 11-1-7.80 Administrative Responsibilities
  239. 11-1-8.10 Purpose
  240. 11-1-8.15 Vacation of Public Street or Right of Way
  241. 11-1-8.20 Land Use Authority
  242. 11-1-8.25 Plat Amendment Process
  243. 11-1-8.30 Boundary Line Adjustment and Parcel Combinations
  244. 11-1-8.35 Vacation of a Recorded Plat
  245. 11-1-9 Amendments to

Links checked 2026-10-19. Links can change. See something wrong or out of date? Call or text 801-664-3370 and we'll fix it.

Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. Only the city or town can confirm what is allowed on a property.

Want a plain-English answer?

Tell us the address and what you'd like to build. A licensed broker reads Moroni's map and code and sends you a free summary.

Get a free Moroni zoning summary

Before you buy land, run the 12-question checklist, or decode a zone code.

CallTextFree summary