11-1-6.35.20 Contents
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Moroni code is at https://moronicity.gov/city-government/city-ordinances/.
Text pulled 2026-10-19 from this source.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Moroni planning before you rely on it.
An applicant for a Final Plat shall submit the following for review: A. All fees for the Final Plat application B. Proof of ownership, in a form acceptable to the City C. A (PDF) file of the Final Plat in a format approved by the City and Sanpete County. The Final Plat of a subdivision shall contain the following: 1. A tie to a section corner and the state plane coordinates of each point. All horizontal data shall be based on the 1927 North American Datum (NAD27) or 1983 North American Datum (NAD83) State Plane Coordinate System. Horizontal datum shall be clearly written on the plat. This shall include all survey monuments and proposed hydrant locations, including bearing and distance of straight lines, and central angle, radius, and arc length of curves, and such information as may be necessary to determine the location of the beginning and ending points of curves. 2. The boundary dimensions and legal description of the subdivision. 3. The proposed subdivision name. 4. A minimum scale of one inch equals fifty (50) feet (1”=50’). 5. A north arrow facing the top right margin. 6. A date on each sheet. 7. A legend of symbols.
8. Accurate dimensions for all lines, angles and curves used to describe boundaries, streets, alleys, easements, areas to be reserved for public use, and other important features; the lines, angles, dimensions, state plane coordinates, bearings, areas and numbers of all lots, blocks and parts reserved for any reason within the subdivision. All dimensions shall be determined by an accurate field survey which shall balance and close as required by the county.
9. The plat shall show the right-of-way lines of each street. The widths and locations of adjoining streets and other public properties within 50 feet of the proposed subdivision. If any street in the subdivision is a continuation or an approximate continuation of an existing street, the conformity or the amount of nonconformity of such street to such existing streets shall be accurately shown.
10. All lots and blocks are to be numbered, addressed, and named in accordance with the street numbering and naming system assigned by the City. Streets indicating numbers and lots numbered consecutively.
11. A statement that “All drinking water lines up to and including the meter and all main sewer lines are dedicated to Moroni City”.
12. A statement that “All municipal utility easements platted hereon are in perpetuity for installation, maintenance, repair, and replacement of public utilities, sidewalks, and appurtenant parts thereof and the right to reasonable access to grantor’s easement shall run with the real property and shall be binding upon the grantor and the grantor’s successors, heirs and assigns”.
13. All offsite easements required to provide services or utilities to the project shall be recorded with the Sanpete County Recorder’s office prior or in conjunction with the Final Plat recordation.
14. There shall be an unencumbered margin of one and one-half (1 1/2) inches on the left-hand side of the sheet and not less than a half (1/2) inch margin around the outer three (3) sides of the sheets. The scale shall be a standard engineering scale of no more than 100 feet to the inch. Space for approved signatures shall include:
1. Owners’ dedication and acknowledgment
2. Administrative Land Use Authority approval
3. Mayor’s signature
4. Public utilities acceptance
5. Public Health Department approval
6. County Recorder’s certificate
15. The name of the engineer or surveyor with a stamp and signature of a surveyor licensed in the State of Utah.
D. Cost estimate of all off-site improvements prepared by the developer’s engineer.
11-1-6.35.15 Application Process · 11-1-6.35.25 Completing a Final Plat Review