Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Moroni zoning code

11-1-5.35 Site Specific Contents

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Moroni code is at https://moronicity.gov/city-government/city-ordinances/. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Moroni planning before you rely on it.
The following documents shall accompany the Record of Survey if and when deemed necessary by the City Engineer: 1. Soils Report. The applicant shall provide a detailed soils report addressing the following issues for the subdivision: hill stabilization, road design including CBR or existing soils, foundation design, groundwater impacts, and general soil stability. The report must be stamped and signed by a Civil Engineer licensed in the state of Utah. The report shall include a minimum groundwater height factor for a peak month in a wet year for the lowest buildable floor elevation. The lowest buildable floor elevation shall be a minimum of three (3) feet above the highest groundwater level in a wet year. Foundation drains shall be required depending on the recommendations based on the GeoTech report. 2. Storm Water Plan. The applicant shall provide a detailed storm water plan for the subdivision. This plan shall include all calculations showing that it meets all the requirements of the Construction Standards. Plans and calculations shall be stamped and signed by a civil engineer licensed in the state of Utah. 3. Wetland Delineation Study. If there are potential wetlands in a development the applicant may be required by the Army Corps of Engineers to submit a wetlands delineation by a qualified wetlands scientist. This delineation may need to be reviewed by a qualified wetlands scientist hired by the City. All costs for the delineation and review shall be borne by the applicant. 4. Other Hazard Information: This may include FEMA floodplain information or others information to mitigate natural hazards.

11-1-5.30 Submittal Contents · 11-1-5.40 Review and Approval Process

Ask a broker about Moroni zoning, free

CallTextFree summary