Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Pleasant View zoning code

18.36.090 PRUD and PUD Culinary Water

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Pleasant View code is at https://www.pleasantviewut.gov/213/Municipal-Code. Text pulled 2026-10-19 from this source. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Pleasant View planning before you rely on it.
Policy for Planned Residential Unit Developments (PRUD) and Planned Unit Developments (PUD) in Pleasant View City, Utah. A. All individual living units will pay a connection fee per unit as established from time to time by the city council. Such fee is to constitute an equitable share of the original capital cost of the water system. The connection fee will be the same as any individual resident's connection fee or in accordance with previous agreements approved by the city. B. The PRUD or PUD will be charged for each individual living unit and will pay a minimum water usage fee as established from time to time by the city council for the first 8,000 gallons of usage per unit. The usage fee will be the same as that charged to any Pleasant View city resident or in accordance with previous agreements as approved by the city. C. Overage usage in the PRUD or PUD in excess of 8,000 gallons per occupied unit as recorded on the master water meter, if installed, will be charged after the 8,000 gallon per occupied unit has been deducted from the master meter reading. The charge for overage usage will be at the current standard city rates. D. A master meter(s) may be required by the city and if so required shall be installed at locations as determined by the city. A regular meter shall be installed for each individual unit. E. All water mains, laterals, and meters will be installed by the PRUD or PUD according to Pleasant View city standards and are to be inspected by the city Engineer or his representative. A regular meter shall be installed on an individual living unit prior to the issuance of a letter of occupancy. F. All maintenance and repairs shall be performed on the water utilities by the PRUD or PUD Home owners association under the direction and inspection of the city. G. The city will read and maintain the master meter, if installed, from the time of acceptance by the city engineer and city council. Regular meters shall be read by the PRUD or PUD owners association monthly and results of the readings will be totaled and forwarded to the city recorder. The owner's association shall be responsible for payment of all association water usage. The city shall have the right to perform a check reading on individual meters as they determine appropriate. H. An approved method of connection of the PRUD or PUD water system to the city water mains will be installed by the PRUD or PUD at the entrance to the PRUD or PUD. I. Water usage overages due to breaks and/or leaks in the PRUD or PUD water system will be treated in the same manner as a break and/or leak in the city non-PRUD or PUD water system. (Ord 90-7, 5/8/90)

18.36.080 Review · 18.36.100 PRUD and PUD Sanitary Sewer Systems

Ask a broker about Pleasant View zoning, free

CallTextFree summary