19.14.03 Site Plan Development Standards

Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. The official Saratoga Springs code is at https://www.saratogasprings-ut.gov/202/Land-Development-Code. Text pulled 2026-10-19 from this source. The city's use tables are images in its PDFs, so they appear nearly empty here. Check the official code for any use table. Tables (like use tables) may not copy cleanly, so check any table against the official code. Confirm anything here with Saratoga Springs planning before you rely on it.
The following are standards required for all Site Plans in any zone: 1. Site Plan Standards. The entire parcel area shall be built upon, landscaped, or paved in accordance with the zone’s open space and parking requirements. 2. Utilities. All utility lines shall be underground in designated easements. No pipe, conduit, cable, water line, gas, sewage, drainage, steam, electrical, or any other energy or service shall be installed or maintained upon any lot outside of any building above the surface of the ground except during construction. a. Transformers shall be grouped with other utility meters where possible and screened with vegetation or fencing. b. Each contractor and owner or developer shall be responsible to know the whereabouts of all underground utilities. Protection of such utilities shall also be their responsibility. c. Prior to construction, contact must be made with Blue Stakes and any other utility company, public or private, not participating in Blue Stakes in the area to identify underground utility lines. d. Exception: electric power transmission lines of 46kV or above are not required to be placed underground. 3. Grading and Drainage. Drainage from any lot must follow current City requirements to show on site retention and a maximum allowable discharge of 0.2 cubic feet per second (cfs) per acre. Drainage shall not be allowed to flow upon adjoining lots unless the owner of the lot upon which the water flows has granted an easement for such purpose. The Planning Commission must approve a Site Plan with grading, drainage, and clearing plans before any such activities may begin. Lot grading shall be kept to a minimum. Roads and development shall be designed for preservation of natural grade except as otherwise approved by the City Engineer based on standards and specifications. 4. Secondary Water System and Dedication of Water Shares. The applicant shall comply with the City’s adopted Water Utility Ordinance and other adopted standards, regulations, and ordinances and shall dedicate to the City the amount of water specified in those adopted standards, regulations, and ordinances upon approval of the Site Plan. 5. Piping of Irrigation Ditches. All existing irrigation canals and ditches which are located on the site or straddle a site property line shall be piped with a sufficient size pipe and shall be approved by the City Engineer. 6. Preliminary Plat with Attached Units. When the proposed Site Plan includes attached units, the Site Plan submittal shall include a preliminary subdivision plat. Said plat shall include an ALTA survey of the property recorded with the Utah County Surveyor pursuant to the Utah Code, the proposed building locations, proposed floor plans and proposed elevations identifying each building in the development. Approval of the proposed Site Plan may occur simultaneously with the approval of the proposed preliminary plat.

19.14.02 Approval Required · 19.14.04 Phased Site Plans for Non-Residential Developments

Ask a broker about Saratoga Springs zoning, free

CallTextFree summary