17-3-3 Development restrictions
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Tooele County code is at https://www.tooeleco.gov/departments/development/land_use_ordinance.php.
Text pulled 2026-10-19 from this source.
Chapter 19 is a scanned image on the county's site and is not included.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Tooele County planning before you rely on it.
In Hazardous Industries (MG-H) zoning districts: (1) Minimum yard setback requirements shall be established in the conditional use permit or planned
unit development approval, except that no building or structure shall be located closer than 300 feet to any district boundary line.
(2) There shall be no maximum building height. (3) Buildings and structures shall cover no more than 50% of the lot area except as may be allowed through planned unit development approval. (4) Improvements required by the planning commission may include:
(a) street grading; (b) street base; (c) curb and gutter; (d) sidewalk; (e) on-site surface drainage facilities; (f) culinary water facilities; (g) wastewater disposal; (h) street monuments; and (i) any other infrastructure deemed necessary. (Ord. 2011-04, 2/1/11; Ord. 2005-30, 11/22/05)
Section 17-4-1.
Uses conditionally exempt from frontage, width, and area requirements of the zoning district.
17-3-2 Permits - Compliance · 17-4-1 Uses conditionally exempt from frontage, width, and area requirements of the zoning district