Utah Zoning

Team Utah Commercial · brokered by RE/MAX Associates · not a government website

Call 801-664-3370

Utah zoning codes · Tooele County

Tooele County zoning

Where to find Tooele County's official zoning rules, and who to ask. This covers land outside city limits; cities and towns in the county have their own codes.

Searchable here: an unofficial copy of Tooele County's Tooele County Land Use Ordinance (chapter PDFs); county code is a single PDF (418 sections), pulled 2026-10-19 from its official website. It may be out of date; the official code controls. Chapter 19 is a scanned image on the county's site and is not included.

Sections

  1. 1-1 Short title
  2. 1-2 Purpose
  3. 1-3 Penalties
  4. 1-4 Violation - Notice and order
  5. 1-5 Civil penalties
  6. 1-6 Enforcement
  7. 1-7 Building permit required
  8. 1-8 Occupancy permit required
  9. 1-9 Site plans required
  10. 1-10 Inspection
  11. 1-11 Interpretation
  12. 1-12 Conflict
  13. 1-13 Validity
  14. 1-14 Effect on previous ordinances
  15. 1-15 Amendments
  16. 1-16 Notice
  17. 1-17 Permits or licenses
  18. 1-18 Fees
  19. 1-19 Improvements – Performance bonds
  20. 1-20 Limit on pending applications per parcel
  21. 2-1 Context
  22. 2-2 Definitions (part 1 of 2)
  23. 2-2 Definitions (part 2 of 2)
  24. 3-1 Tooele County General Plan
  25. 3-2 Planning commission responsibility
  26. 3-3 Application to amend the general plan
  27. 3-4 Restriction on applications after adoption of general plan
  28. 3-5 Effect of the plan on public uses
  29. 3-6 Land use ordinance
  30. 3-7 Amendment procedure
  31. 3-8 Initiation of land use ordinance text and zoning map amendments
  32. 3-9 Zoning map amendment procedure
  33. 3-10 County commission consideration for zoning map amendment--Hearing-Notice
  34. 3-11 Restriction on applications after decision of rezone application
  35. 3-12 Application for the initiation of land use ordinance text amendments
  36. 3-13 Determination of commissioners
  37. 3-14 Appeal procedure
  38. 3-15 Conditions to zoning map amendment
  39. 4-1 Effect of chapter
  40. 4-2 Substandard lots at time of ordinance passage
  41. 4-3 Lot standards
  42. 4-4 Every dwelling to be on a lot – Exceptions
  43. 4-5 Yard space for one building only
  44. 4-6 Private garage with side yard - Reduced yards
  45. 4-7 Sale or lease of required space
  46. 4-8 Sale of lots below minimum space requirements
  47. 4-9 Yards to be unobstructed - Exceptions
  48. 4-10 Repealed
  49. 4-11 Exceptions to height limitations
  50. 4-12 Minimum height of main building
  51. 4-13 Repealed
  52. 4-14 Clear view of intersecting streets
  53. 4-15 Maximum height of fences, walls and hedges
  54. 4-16 Water and sewerage requirements
  55. 4-17 Curbs, gutters and sidewalks
  56. 4-18 Effect of official map
  57. 4-19 Lots on private streets
  58. 4-20 Lots divided by a zone boundary
  59. 4-21 Disconnection or disincorporation of property
  60. 4-22 Animal and fowl restrictions
  61. 4-23 Off-site improvements
  62. 4-24 Commercial renting of dwellings prohibited
  63. 4-25 Temporary residences for emergency construction or repair
  64. 5-1 Purpose
  65. 5-2 Repairs and alterations
  66. 5-3 Additions, enlargements, and moving
  67. 5-4 Alteration where parking insufficient
  68. 5-5 Restoration of damaged buildings
  69. 5-6 One-year vacancy or abandonment
  70. 5-7 Continuation of use
  71. 5-8 Occupancy within one year
  72. 5-9 Change of use
  73. 5-10 Expansion permitted
  74. 5-11 Nonconforming use of land
  75. 5-12 The doctrine of diminishing assets
  76. 6-1 Purpose and scope
  77. 6-2 Off-street parking required
  78. 6-3 Site plan requirements for a building permit
  79. 6-4 Access to individual parking spaces
  80. 6-5 Number of parking spaces
  81. 6-6 Parking for the disabled
  82. 6-7 Access requirements
  83. 6-8 Location of gasoline pumps
  84. 6-9 Maintenance of parking lots
  85. 6-10 Off-street parking dimensions
  86. 7-1 Definition of conditional use
  87. 7-2 Permit required
  88. 7-3 No presumption of approval
  89. 7-5 Determination
  90. 7-6 Fee
  91. 7-7 Public hearing
  92. 7-8 Appeals
  93. 7-9 Compliance and inspection
  94. 7-10 Substantial action required
  95. 7-11 Notification required
  96. 7-12 Amendment of a conditional use permit
  97. 7-13 Revocation
  98. 7-14 Temporary permits
  99. 7-15 Professional filming
  100. 8-1 Purpose
  101. 8-2 General provisions
  102. 8-3 Nuisance and abatement
  103. 8-4 Performance standards procedure
  104. 8-5 Enforcement provisions applicable to all uses
  105. 8-6 Exemptions from public nuisance for agricultural practices in an agricultural protection zone
  106. 8-7 Locations where determinations are to be made for enforcement
  107. 8-8 Dangerous and objectionable elements
  108. 8-9 Junk, disposal, dumping, display, collection and storage
  109. 8-12 Storage of explosives and hazardous materials
  110. 8-13 On site lighting
  111. 8-14 Nuisance Weeds
  112. 10-1 Purpose
  113. 10-2 Location and use
  114. 10-3 Permanent residential placement of mobile and manufactured homes
  115. 11-1 Purpose
  116. 11-2 Storage and use of recreational coaches
  117. 11-3 Recreational coach parks
  118. 12-1 Purpose
  119. 12-2 Scope of application
  120. 12-3 Scope of modifications authorized
  121. 12-5 General site plan content
  122. 12-6 Storm water drainage. Provisions for storm surface drainage shall be
  123. 12-7 Utilities
  124. 12-8 Procedures for site plan review
  125. 14-1 Establishment of zoning districts
  126. 14-2 Rules for locating boundaries
  127. 15-1-1 Purpose of multiple use districts
  128. 15-1-2 MU-40 development restrictions
  129. 15-1-3 MU-80 development restrictions
  130. 15-1-4 MU-160 development restrictions
  131. 15-2-1 Purposes of agricultural districts
  132. 15-2-2 A-5 development restrictions
  133. 15-2-3 A-10 development restrictions
  134. 15-2-4 A-20 development restrictions
  135. 15-2-5 A-40 development restrictions
  136. 15-3-1 Purposes of rural residential districts
  137. 15-3-2 RR-1 development restrictions
  138. 15-3-3 RR-5 development restrictions
  139. 15-3-4 RR-10 development restrictions
  140. 15-4-1 Uses conditionally exempt from frontage, width, and area requirements of the zoning district
  141. 15-5-1 Codes and symbols
  142. 15-5-2 Uses
  143. 15-5-3 Use tables
  144. 15-5-4 Farm animal units per acreage
  145. 16-1-1 Purposes of Residential District R-1-8
  146. 16-1-2 R-1-8 development restrictions
  147. 16-1-3 Purposes of Residential District R-1-10
  148. 16-1-4 R-1-10 development restrictions
  149. 16-1-5 Purposes of Residential District R-1-12
  150. 16-1-6 R-1-12 development restrictions
  151. 16-1-7 Purposes of Residential District R-1-21
  152. 16-1-8 R-1-21 development restrictions
  153. 16-2-1 Purposes of Multiple Residential Districts R-M-7
  154. 16-2-2 R-M-7 development restrictions
  155. 16-2-3 Purposes of Multiple Residential District R-M-15
  156. 16-2-4 R-M-15 development restrictions
  157. 16-2-5 Purposes of Multiple Residential District R-M-30
  158. 16-2-6 R-M-30 development restrictions
  159. 16-3-1 Uses conditionally exempt from frontage, width, and area requirements of the zoning district
  160. 16-4-1 Codes and symbols
  161. 16-4-2 Uses
  162. 16-4-3 Use tables
  163. 16-4-4 Farm animal units per property
  164. 17-1-1 Purpose of Commercial Neighborhood (C-N) zoning districts
  165. 17-1-2 Purpose of Commercial Shopping (C-S) zoning districts
  166. 17-1-3 Purpose of Commercial Highway (C-H) zoning districts
  167. 17-1-4 Purpose of Commercial General (C-G) zoning districts
  168. 17-1-5 Development restrictions in commercial zones
  169. 17-1-6 Maximum building heights
  170. 17-2-1 Purpose of Manufacturing Distribution (M-D) zoning districts
  171. 17-2-2 Purpose of Manufacturing General (M-G) zoning districts
  172. 17-2-3 Development restrictions to manufacturing zoning districts generally
  173. 17-2-4 Development restrictions specific to M-D zoning districts
  174. 17-2-5 Maximum building heights
  175. 17-3-1 Purpose of Hazardous Industries (MG-H) zoning districts
  176. 17-3-2 Permits - Compliance
  177. 17-3-3 Development restrictions
  178. 17-4-1 Uses conditionally exempt from frontage, width, and area requirements of the zoning district
  179. 17-5-1 Codes and symbols
  180. 17-5-2 Uses
  181. 17-5-3 Use tables
  182. 17-6-1 Aerospace and defense manufacturing
  183. 17A-1-3 Maximum building heights
  184. 17A-2-3 Development restrictions specific to RRS zoning districts
  185. 17A-2-4 Maximum building heights
  186. 17A-3-1 Purpose of Technology Industries (T-I) zoning district
  187. 17A-3-2 Development restrictions in the Technology Industries (T-I) zones
  188. 17A-3-3 Maximum building heights
  189. 17A-5-1 Codes and symbols
  190. 17A-5-2 Uses
  191. 17A-5-3 Use tables
  192. 18-1-1 Purpose
  193. 18-1-2 Prohibitions
  194. 18-1-3 Existing permit amendment procedure
  195. 18-1-4 Tooele County Environmental Impact Board
  196. 18-1-5 EIB action on the Environmental Impact Study
  197. 18-1-6 Location criteria emphasis in the EIS
  198. 18-1-7 Action of the Board of County Commissioners
  199. 20-1 Purpose
  200. 20-2 Residential facilities for elderly persons
  201. 21-1-1 Purpose
  202. 21-1-2 Conditional Uses
  203. 21-1-3 Permitted Uses
  204. 21-2-1 Development restrictions
  205. 21-2-2 Alternative building materials or methods
  206. 21-2-3 Special building construction regulations
  207. 21-2-4 Area, width, frontage, yard, coverage, and height regulations
  208. 22-1 Purpose
  209. 22-2 Application
  210. 22-3 Permitted uses
  211. 22-4 Conditional uses
  212. 22-5 Special provisions
  213. 22-6 Area, width, frontage, yard, coverage, and height regulations
  214. 23-1 Purpose
  215. 23-2 Application
  216. 23-3 Land Uses
  217. 23-4 Conditional Use Permits Required
  218. 23-5 Area, Width, Height, and Coverage Regulations
  219. 23-6 Standards
  220. 23-7 Violations
  221. 23-8 Preexisting Accesses
  222. 23-9 Abandonment
  223. 24-1-1 Purpose
  224. 24-1-2 Scope
  225. 24-1-3 Interpretation
  226. 24-1-4 Sign permit process
  227. 24-2-1 Illegal signs
  228. 24-2-2 Enforcement authorization
  229. 24-2-3 Appeal
  230. 24-3-1 Regulation, containment and elimination
  231. 24-3-2 Alterations
  232. 24-3-3 Restoration
  233. 24-3-4 Maintenance
  234. 24-3-5 Abandonment
  235. 24-3-6 Signs to be made conforming
  236. 24-3-7 Special exceptions
  237. 24-4-1 General sign requirements
  238. 24-4-2 Site plan review and design
  239. 24-4-3 Permit tags
  240. 24-4-4 Prohibited sign devices
  241. 24-4-5 Dangerous, defective and non-maintained signs
  242. 24-4-6 On-premise electronic message centers
  243. 24-5-1 General provisions
  244. 24-5-2 Notice bulletin boards
  245. 24-5-3 Political or campaign signs
  246. 24-5-4 Development and real estate signs in residential areas
  247. 24-5-5 Development and real estate signs in commercial and industrial areas
  248. 24-5-6 Signs allowed in all zoning districts
  249. 24-6-1 General regulations
  250. 24-6-2 Permit application requirements
  251. 24-6-3 Business related temporary signs
  252. 24-6-4 Temporary signs not requiring a permit
  253. 24-6-5 Repealed
  254. 24-7-1 Regulated sign area
  255. 24-7-2 Wall sign
  256. 24-7-3 Multiple face sign
  257. 24-7-6 Spherical, free-form, sculptural, or other non-planer signs
  258. 24-8-1 Purpose and intent
  259. 24-8-2 Permit application requirements
  260. 24-8-3 Safety and location standards for permanent signs
  261. 24-9-1 Codes and symbols
  262. 24-9-2 Use tables
  263. 25-1 Purpose
  264. 25-2 Application
  265. 25-3 Zone 1
  266. 25-4 Zone 2
  267. 25-5 Zone 3
  268. 25-7 Public drinking water systems data
  269. 26-1-1 Purpose
  270. 26-1-2 Definitions
  271. 26-1-3 Conditional use permit application
  272. 26-1-4 Reporting
  273. 26-1-5 Waste facility inspections
  274. 26-2-1 Purpose of the construction debris overlay zone (CDO)
  275. 26-2-2 Application of the construction debris overlay zone
  276. 26-2-3 Materials allowed
  277. 26-2-4 Location standards for construction debris disposal facilities
  278. 26-2-5 Permitted and conditional uses
  279. 26-3-1 Purpose
  280. 26-3-2 Creation and location
  281. 26-3-4 Permitted and conditional uses
  282. 26-4-1 Codes and symbols
  283. 26-4-2 Uses
  284. 27-1 Purpose
  285. 27-2 Permitted and conditional uses
  286. 27-3 Operation categories
  287. 27-4 Application
  288. 27-5 Minimum Requirements
  289. 27-6 Codes and symbols
  290. 27-7 Uses
  291. 28-1 Purpose and scope
  292. 28-2 Definitions
  293. 28-3 Applicability
  294. 28-4 Site location master plan
  295. 28-5 Facility types and standards
  296. 28-6 Collocation of antennas
  297. 28-7 Location on residential lots prohibited
  298. 28-8 Color
  299. 28-9 Sites in foothills and canyons
  300. 28-11 Notice to neighboring jurisdictions
  301. 28-12 Additional requirements
  302. 28-13 Accessory buildings
  303. 28-14 Non-maintained or abandoned facilities
  304. 28-15 Building permit required
  305. 29-1 Purpose
  306. 29-2 Boundary
  307. 29-3 Definitions
  308. 29-4 Application
  309. 31-1 Definitions
  310. 31-2 Purpose
  311. 31-3 Land use districts
  312. 31-4 P-C zone area – minimum requirements
  313. 31-5 Permitted uses
  314. 31-6 Conditional uses
  315. 31-7 Planning and approval process for P-C zone
  316. 31-8 P-C zone plan
  317. 31-9 Community structure plan (CSP)
  318. 31-10 Project plan/subdivision plat
  319. 31-11 Site plan review
  320. 31-12 Development standards
  321. 31-13 Development agreement
  322. 32-1-1 Purpose
  323. 32-2-1 Conditional Uses (Planning Commission Review)
  324. 32-2-2 Prohibited Uses
  325. 32-3-1 Setbacks
  326. 32-3-2 Height
  327. 32-3-3 Visual and Environmental Mitigation
  328. 32-3-4 Noise
  329. 32-3-5 Safety and Emergency Preparedness
  330. 32-3-6 Decommissioning
  331. 32-4-1 Pre-Application Meeting
  332. 32-4-2 Required Submittals
  333. 32-4-3 Public Hearings
  334. 32-4-4 Approval Criteria
  335. 32-5-1 Zone Designation and Mapping
  336. 32-6-1 Enforcement and Compliance
  337. 33-1 Definitions
  338. 33-2 Names of streets designated on official map
  339. 33-3 Numbering
  340. 33-4 Exceptions
  341. 33-5 Stansbury Park
  342. 33-6 Failure to number
  343. 33-7 Display of house number
  344. 35-1-1 Short title
  345. 35-1-2 Purpose
  346. 35-1-3 Notice
  347. 35-1-4 Penalties
  348. 35-1-5 Creation of substandard lots prohibited
  349. 35-1-6 Subdivisions located near a state protection area
  350. 35-1-7 Plats required
  351. 35-1-8 Certain agricultural partitions exempt
  352. 35-1-9 Condominium projects
  353. 35-2-1 Application expiration
  354. 35-2-2 Application procedure
  355. 35-2-3 Final plat requirements
  356. 35-2-4 Infrastructure design and engineering drawings requirements
  357. 35-3-1 Standards
  358. 35-3-2 Approval process
  359. 35-4-1 Standards
  360. 35-4-2 Approval process
  361. 35-4-3 Phased development
  362. 35-4-4 Master plan requirements
  363. 35-4-5 Master plan application (Preliminary plan)
  364. 35-4-6 Final plat application
  365. 35-4-7 Utility and agency response
  366. 35-5-1 Purpose
  367. 35-5-2 Applicability of regulations
  368. 35-5-3 Application requirements
  369. 35-5-4 Open space requirements
  370. 35-5-5 Open space network configuration
  371. 35-5-6 Open space and conservation areas
  372. 35-5-7 Primary conservation areas
  373. 35-5-8 Value of primary conservation areas
  374. 35-5-9 Secondary conservation areas
  375. 35-5-10 Ownership and management of open space
  376. 35-5-11 Prohibited uses of open space
  377. 35-5-12 Requirements for conservation easements
  378. 35-6-1 Application
  379. 35-6-2 Lots
  380. 35-6-3 Roads
  381. 35-6-4 Frontage on arterial and collector roads
  382. 35-6-5 Sidewalks, curbs, and gutters
  383. 35-6-6 Monuments
  384. 35-6-7 Easements
  385. 35-6-8 Utilities to be underground
  386. 35-6-9 Sewer systems
  387. 35-6-10 Sanitary sewer mains, laterals, and house connections – Future
  388. 35-6-11 Water supply
  389. 35-6-12 Storm drainage and floodplains
  390. 35-6-13 Fire mitigation standards
  391. 35-6-14 Street connectivity requirements
  392. 35-6-15 Master Planned and Off-Street Trails
  393. 35-7-1 Improvement completion assurance
  394. 35-7-2 Default
  395. 35-7-3 Maintenance guarantee
  396. 35-7-4 Acceptance and release of surety
  397. 35-7-5 Engineering review and inspection fee
  398. 35-8-1 Vacating or changing a subdivision plat
  399. 35-8-2 Filing of a petition to vacate, alter, or amend a plat – Notice
  400. 35-8-4 Boundary adjustments
  401. 36-1 Purpose and findings
  402. 36-2 Definitions
  403. 36-3 Applicability and administration
  404. 36-4 Indoor plumbing fixture standards
  405. 36-5 Water supply and development review
  406. 36-6 Outdoor landscaping and irrigation standards
  407. 36-7 Landscape plan requirements, installation, and certification
  408. 36-8 Ownership, maintenance, and property associations
  409. 36-9 Car wash water efficiency standards
  410. 36-10 Exceptions and alternative compliance
  411. 36-11 Enforcement, violations, and penalties
  412. 36-12 Conflict with state law and severability
  413. 37-1 Purposes
  414. 37-2 Definitions
  415. 37-3 Cannabis production establishment standards
  416. 37-4 Cannabis production establishment location restrictions
  417. 37-5 Medical cannabis pharmacy standards
  418. 37-6 Medical cannabis pharmacy location restrictions

Links checked 2026-10-19. Links can change. See something wrong or out of date? Call or text 801-664-3370 and we'll fix it.

Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build. Only the county can confirm what is allowed on a property.

Want a plain-English answer?

Tell us the address and what you'd like to build. A licensed broker reads Tooele County's map and code and sends you a free summary.

Get a free Tooele County zoning summary

Before you buy land, run the 12-question checklist, or decode a zone code.

CallTextFree summary