35-4-6 Final plat application
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Tooele County code is at https://www.tooeleco.gov/departments/development/land_use_ordinance.php.
Text pulled 2026-10-19 from this source.
Chapter 19 is a scanned image on the county's site and is not included.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Tooele County planning before you rely on it.
(1) After the preliminary plan is approved by Planning Commission, the applicant shall submit an
accurate final plat to the Community Development Department. (2) When it is determined that the final plat is accurate and complete, the applicant shall submit the
final PDF copy, legibly reproducible for a 24”x36” print, of the plat with all required signatures for approval by the Community Development Department.
(3) The final plat application shall include: (a) the application form; (b) a cost estimate for construction of infrastructure, approved and signed by the County
Engineer; (c) an agreement for subdivision improvements; (d) the original engineered pdf file of the final plat and infrastructure design and engineering
drawings for distribution to affected entities; (e) evidence of water rights for all lots;
(f) the type of water system proposed, historical water use, the estimated number of gallons per day of water system requirements, and a description of water storage requirements for daily fluctuations, irrigation, and fire suppression;
(g) proof of ownership demonstrated by a title report completed within the previous six months; (h) geologic technical maps and investigation reports regarding area suitability; (i) a completed County Health Department Subdivision Feasibility Study; and (j) any unpaid fees owed to Tooele County for the development of land, code enforcement, or building permits. (4) All signature blocks except for the Planning Commission and Community Development shall be signed by the appropriate authority before the plat is submitted to the Community Development Department. (5) An approved final plat shall be valid for no more than 14 months. The applicant or authorized representative may obtain no more than two six-month extensions by petitioning the Planning Commission. The Planning Commission may not grant any extension without substantial progress having been demonstrated by the applicant or authorized representative. (6) The Community Development Department shall sign the final plat only after it has been approved by all reviewing agencies. The improvement agreements and bonds shall be forwarded to the County Manager for approval and acceptance. The plat shall be recorded within 14 months of approval, or it shall be void. (7) After 30 days of approving final plat, the County shall submit to the Geospatial Resource Center: (a) an electronic copy of the approved plat; or (b) preliminary geospatial data that depict any new streets and situs addresses purposed for construction within the bounds of the approved plat. (Ord. 2025-11, 8/19/25; Ord. 2024-13; 10/1/24; Ord. 2023-20, 11/7/23; Ord. 2022-32, 11/29/22)
35-4-5 Master plan application (Preliminary plan) · 35-4-7 Utility and agency response