35-5-3 Application requirements
Unofficial copy. It may be out of date. Not legal or zoning advice. Zoning rules change, and only the city or county can say for sure what is allowed on a property. Confirm with the city or county planning department before you buy, sign or build.
The official Tooele County code is at https://www.tooeleco.gov/departments/development/land_use_ordinance.php.
Text pulled 2026-10-19 from this source.
Chapter 19 is a scanned image on the county's site and is not included.
Tables (like use tables) may not copy cleanly, so check any table against the official code.
Confirm anything here with Tooele County planning before you rely on it.
(1) Concurrent with submitting a master plan, the applicant shall prepare and submit a site analysis
map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified before the creation of the site design and that the proposed open space will meet the requirements of this chapter. The site master plan shall include the following features:
(a) property boundaries; (b) all streams, rivers, lakes, wetlands, and other hydrologic features; (c) topographic contours of no less than 10-foot intervals; (d) all primary and secondary conservation areas, labeled by type; (e) general vegetation characteristics; (f) general soil types; (g) the planned location of protected open space; (h) existing roads and structures; and (i) potential connections with existing greenspace and trails. (2) An open space management plan shall be prepared and submitted before the approval of the final plat. (3) An instrument permanently protecting the open space, such as a conservation easement, shall be recorded concurrently with the issuance of a state issued land disturbance permit. (4) The applicant shall adhere to all other applicable requirements of the underlying zoning district and county land use codes. (5) A conservation subdivision shall require a development agreement to establish lot and design standards. (Ord. 2022-32, 11/29/22)
35-5-2 Applicability of regulations · 35-5-4 Open space requirements